© Baxi Heating UK Ltd 2009
11.0
Fault Finding
43
Replace the gas valve
Replace PCB
Boiler satisfactory
Set burner pressure to
16mbar ± 0.5
Does
the pilot burner
light ?
Does
the main burner
light ?
Does
the boiler shut
down when the water
flow reaches
80-84
o
C ?
Does
pump run
on ?
Is
"Burner On"
light on ?
Are live &
neutral reversed ?
Indicator light inside box
will be lit
Check pilot flame for
correct size
Check & clean electrode.
Check spark gap. Check
electrode lead
Check there is
20mbar gas pressure at
the inlet to gas valve
Check there is
20mbar gas pressure at
the inlet to gas valve
Check the pilot injector is not
blocked, partially blocked or
damaged
Check there is
20mbar gas pressure at
the inlet to gas valve
Is
there the
correct burner pressure
at the test point ?
YES
YES
YES
YES
YES
NO
NO
NO
NO
NO
Check pilot injector is
not blocked
Check main injector
is not blocked
Warning
It is important that both the air and flue ducts are cut to
their correct lengths also ensure that the flue duct is
fully engaged.
Failure to comply with the recommended fitting
instructions will adversly affect the operation of the
appliance.
Check pilot flame
size
YES
YES
YES
YES
Check pilot hood
position and pilot
air flow
Check continuity across
mains solenoid (5 K
OHM)
Change gas valve
NO
Change PCB
YES
Testing Potentiometer
Three Pin Connector
Set multimeter to the 2 M OHM scale.
Turn potentiometer to the OFF position,
connect the multimeter leads to the
blue/red wire and centre black/yellow
wire of three pin connector.
The reading on the multimeter should
indicate approx 1 M OHM, switch
potentiometer to the ON position, the
reading on the multimeter should be
approx 1 M OHM. Slowly turn
potentiometer knob to the FULL ON
position, the reading on the multimeter
should decrease, proportionally down to
0 OHMs.
Connect multimeter to centre
black/yellow wire and red/yellow wire,
turn potentiometer knob to fully OFF
position, reading on multimeter should
be 0 OHM. Switch potentiometer to
ON position, slowly turn potentiometer
knob to the fully ON position, the
reading on multimeter should increase
proportionally to 1 M OHM, turn
potentiometer off. Reading on
multimeter should indicate 0 OHM.
Two Pin Connector
Check potentiometer is in OFF position.
Set multimeter to continuity, connect
multimeter leads to both potentiometer
leads. Turn potentiometer to the on
position, the multimeter's audible alarm
should now be sounding to indicate
continuity.
Replace PCB
Replace sensor
Check
Potentiometer
(see table)
Содержание Solo 3 PFL 30
Страница 45: ... Baxi Heating UK Ltd 2009 13 0 Notes 45 ...