Baxi Megao System 15 - Megao System 18 - Megao System 24 - Megao System 28 - Megao System 32 Скачать руководство пользователя страница 9

6.0 Legislation

9

© Baxi Heating UK Ltd 2015

6.1

Installation, Commissioning, Service & Repair

1. This appliance must be installed in accordance with the
manufacturer’s instructions and the regulations in force. Read
the instructions fully before installing or using the appliance.

2. In GB, this must be carried out by a competent person as
stated in the Gas Safety (Installation & Use) Regulations.

3. 

Definition of competence:

A person who works for a Gas

Safe registered company and holding current certificates in the
relevant ACS modules, is deemed competent.

4. In IE (Eire), this must be carried out by a competent person
as stated in I.S. 813 “Domestic Gas Installations”.

All Gas Safe registered engineers carry an ID card with their
licence number and a photograph. You can check your
engineer is registered by telephoning 0800 408 5500 or online
at www.gassaferegister.co.uk

The boiler meets the requirements of Statutory Instrument
“The Boiler (Efficiency) Regulations 1993 No 3083” and is
deemed to meet the requirements of Directive 92/42/EEC on
the energy efficiency requirements for new hot water boilers
fired with liquid or gaseous fuels:-

Type test for purpose of Regulation 5 certified by:
Notified Body 0085.

Product/Production certified by:
Notified Bodies 0086.

For GB/IE only.

6.2 

Benchmark Commissioning Checklist

1. Please ensure that the installer has fully completed the
Benchmark Checklist on the inside back pages of the
installation instructions supplied with the product and that you
have signed it to say that you have received a full and clear
explanation of its operation. The installer is legally required to
complete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and Wales).

2. All installations must be notified to Local Area Building
Control either directly or through a Competent Persons
Scheme. A Building Regulations Compliance Certificate will
then be issued to the customer who should, on receipt, write
the Notification Number on the Benchmark Checklist.

3. This product should be serviced regularly to optimise its
safety, efficiency and performance. The service engineer should
complete the relevant Service Record on the Benchmark
Checklist after each service.

4. The Benchmark Checklist may be required in the event of
any warranty work.

Содержание Megao System 15 - Megao System 18 - Megao System 24 - Megao System 28 - Megao System 32

Страница 1: ...o System User Guide Gas Fired Wall Mounted Condensing System Boiler 15 18 24 28 32 en United Kingdom Please keep these instructions in a safe place If you move house please hand them over to the next occupier ...

Страница 2: ...g address The Company Secretary Baxi Heating UK Ltd Brooks House Coventry Road Warwick CV34 4LL Full acknowledgement of author and source must be given WARNING Any person who does any unauthorised act in relation to a copyright work may be liable to criminal prosecution and civil claims for damages Boiler Controls see opposite page for Operating Quick Reference Guide 0086 ISO 9001 FM 00866 The Ben...

Страница 3: ...icator The indicator will illuminate when the burner has fired and is heating your central heating or domestic hot water Boiler Output Temperature In either the central heating or domestic hot water position the display will illuminate showing the current boiler temperature in degrees centigrade Central Heating System Pressure The normal operating water pressure is between 1 and 2 0 bar If the pre...

Страница 4: ...er is switched on Is the display lit Display Central Heating Indicator Burner On Indicator Boiler operating satisfactorily bar 0 1 2 3 4 Is the Central Heating System Pressure between 1 and 2 5 bar If the reading falls below 1 bar repressurise the system as described in section 3 1 Does the display show an error code e g E133 E110 Boiler not working NO NO YES YES YES NO Turn the ON OFF Reset Selec...

Страница 5: ...fitted set high enough 15 10 5 20 2 5 15 10 5 20 2 5 Turn Room Thermostat to maximum setting typical example shown If you don t know what you need to do to get the boiler to light or need help with the system and controls contact your installer as soon as possible YES NO CONTACTYOUR INSTALLER OR SERVICE ENGINEER YES 12 1 2 3 4 5 6 7 8 9 1 0 11 CH ON CH OFF Typical examples of external timer NO ...

Страница 6: ...taller who fitted the boiler 4 The filling loop consists of two taps and a separate metal braided hose with connection fittings 5 Only when repressurising should the hose be connected between the two taps Ensure that the nuts on the pipe ends are tightened onto the taps 6 Fully open one of the taps first and then while watching the pressure gauge carefully open the second tap 7 When the needle on ...

Страница 7: ...ve the following minimum clearances for Safety and Maintenance Figs 3 4 Top 200mm Bottom 150mm Left side 5mm Right Side 5mm Front 5mm In Operation 450mm For Servicing This is the MINIMUM recommended dimension Greater clearance than this will aid installation and maintenance 7 If your boiler is installed in a compartment do not use it for storage purposes Do not obstruct any purpose provided ventil...

Страница 8: ... E then 50 3 E20 E28 E50 E125 E160 indicate faulty components You should make a note of the displayed error code and contact your installer or service engineer 4 If E110 or E130 is displayed overheat of the primary water or flue system has occurred Turn the selector switch to the reset position and hold for at least 5 seconds If the boiler does not relight or the code is displayed regularly contac...

Страница 9: ...iciency requirements for new hot water boilers fired with liquid or gaseous fuels Type test for purpose of Regulation 5 certified by Notified Body 0085 Product Production certified by Notified Bodies 0086 For GB IE only 6 2 Benchmark Commissioning Checklist 1 Please ensure that the installer has fully completed the Benchmark Checklist on the inside back pages of the installation instructions suppl...

Страница 10: ...ur installer and records that the boiler has been installed and commissioned correctly It can be found at the back of the installation and service manual and should be kept in a safe place for the life of the boiler We will check that the Benchmark Checklist has been completed on an in warranty visit Ways to register your warranty If your boiler is eligible for an extended warranty your installer ...

Страница 11: ...am of Gas Safe registered engineers to visit If your product is in warranty everything is free of charge subject to our warranty terms and conditions If it is out of warranty we can still help and offer a range of options you can choose from to suit your needs Contact Baxi Customer Support 0344 871 1525 Opening hours Monday Friday 8 00am 6 00pm Weekends and Bank Holidays 8 30am 2 00pm Please note ...

Страница 12: ...ted or Psup Seasonal space heating energy efficiency Annual energy consumption Sound power level LWA indoors See For specific precautions about assembling installing and maintaining consult the relevant section as detailed on the Contents page kW 15 91 13187 47 52 kWh GJ dB A A A A A Baxi Megaflo System ErP 18 15 24 28 32 18 91 15824 57 53 24 92 20870 75 58 28 92 24348 88 53 32 92 27826 100 54 ...

Страница 13: ... g a k c a p f o s s a l c y c n e i c fi f e y g r e n e g n i t a e h e c a p s l a n o s a e S e g a k c a p f o y c n e i c fi f e y g r e n e g n i t a e h e c a p s l a n o s a e S R O n i y c n e i c fi f e y g r e n e g n i t a e h e c a p s l a n o s a e S p m u p t a e h y r a t n e m e l p p u S g n i t a r k n a T n i y c n e i c fi f e r o t c e l l o C m n i e m u l o v k n a T m n i e z...

Страница 14: ...l expression 115 11 ʷ Prated whereby Prated is related to the preferential space heater Weighting of boilers 0 0 0 0 1 0 3 0 37 0 2 0 55 0 70 0 3 0 75 0 85 0 4 0 85 0 94 0 5 0 95 0 98 0 6 0 98 1 00 0 7 1 00 1 00 1 The intermediate values are calculated by linear interpolation between the two adjacent values 2 Prated is related to the preferential space heater or combination heater III IV I V Psup ...

Страница 15: ...vice Engineer as soon as possible If you smell gas Do not operate light switches Do not operate any electrical equipment Do not use a telephone in the hazardous area Extinguish any naked flame and do not smoke Open windows and doors in the hazardous area Turn off the gas supply at the meter Warn any other occupants and vacate the premises Telephone the National Gas Emergency Service on 0800 111 99...

Страница 16: ...ll terms and conditions visit www baxi co uk terms Failure to adhere to terms and conditions will void your manufacturer s warranty Baxi Brooks House Coventry Road Warwick CV34 4LL Please ensure the boiler is installed in accordance with these installation instructions and that you adhere to the Building Regulations e oe All descriptions and illustrations provided in this document have been carefu...

Отзывы: