background image

10

© Baxi Heating UK Ltd 2013

7.0 Legislation

7.1

       Installation, Commissioning, Service & Repair

1. This appliance must be installed in accordance with the
manufacturer’s instructions and the regulations in force. Read
the instructions fully before installing or using the appliance.

2. In GB, this must be carried out by a competent person as
stated in the Gas Safety (Installation & Use) Regulations.

3. 

Definition of competence:

A person who works for a Gas

Safe registered company and holding current certificates in the
relevant ACS modules, is deemed competent.

4. In IE (Eire), this must be carried out by a competent person
as stated in I.S. 813 “Domestic Gas Installations”.

Lifting -

This product should be lifted and handled by two

people. Stooping should be avoided and protective equipment
worn where necessary. Carrying & lifting equipment should be
used as required, e.g. when installing in a loft space.

All Gas Safe registered engineers carry an ID card with their
licence number and a photograph. You can check your
engineer is registered by telephoning 0800 408 5500 or online
at www.gassaferegister.co.uk

The boiler meets the requirements of Statutory Instrument
“The Boiler (Efficiency) Regulations 1993 No 3083” and is
deemed to meet the requirements of Directive 92/42/EEC on
the energy efficiency requirements for new hot water boilers
fired with liquid or gaseous fuels:-

Type test for purpose of Regulation 5 certified by:
Notified Body 0085.

Product/Production certified by:
Notified Body 0086.
Ref: 86-BL-647

For GB/IE only.

7.2

       Benchmark Commissioning Checklist

1. Please ensure that the installer has fully completed the
Benchmark Checklist on the inside back pages of the
installation instructions supplied with the product and that you
have signed it to say that you have received a full and clear
explanation of its operation. The installer is legally required to
complete a commissioning checklist as a means of complying
with the appropriate Building Regulations (England and
Wales).

2. All installations must be notified to Local Area Building
Control either directly or through a Competent Persons
Scheme. A Building Regulations Compliance Certificate will
then be issued to the customer who should, on receipt, write
the Notification Number on the Benchmark Checklist.

3. This product should be serviced regularly to optimise its
safety, efficiency and performance. The service engineer should
complete the relevant Service Record on the Benchmark
Checklist after each service.

4. The completed Benchmark Checklist may be required in the
event of any warranty work.

Содержание Megaflo 2 System 24 Compact GA

Страница 1: ...eep these instructions in a safe place If you move house please hand them over to the next occupier User s Operating Instructions Important Warranty Information Megaflo 2 System 24 Compact Gas Fired Wall Mounted Condensing System Boiler ...

Страница 2: ...es any unauthorised act in relation to a copyright work may be liable to criminal prosecution and civil claims for damages 1 0 Quick Reference Guide 3 2 0 Troubleshooting 4 3 0 Temperature Adjustment Care of the Boiler 6 4 0 Repressurising System Service Due 7 5 0 Clearances 8 6 0 Error Codes 9 7 0 Legislation 10 8 0 Emergency 11 9 0 Warranty Service Back page e g a P n o i t c e S Contents Boiler...

Страница 3: ... see 4 2 Display Description Central Heating Temperature Adjustment Boiler Information View Standby Reset Esc R Standby Reset Esc Button Boiler Information View Button Increase Central Heating Temperature Button Decrease Central Heating Temperature Button Inactive Button Inactive Button On Off Selector Button Key to Controls R When is displayed Boiler On the boiler will respond to timed Heating or...

Страница 4: ...ectrical supply to boiler is switched on NO YES Is the Burner Flame symbol showing R Burner Flame Indicates burner is on Boiler operating satisfactorily NO YES YES YES Is the E and R symbol illuminated or flashing R YES Press the Reset Button Error Symbol If it does not reset CONTACTYOUR INSTALLER OR SERVICE ENGINEER R Reset Symbol Is the Spanner symbol illuminated or flashing YES Spanner Symbol B...

Страница 5: ...er to light or need help with the system and controls contact your installer as soon as possible CH ON CH OFF bar 0 1 2 3 4 Is the Central Heating System Pressure between 1 and 2 5 bar If the reading falls below 1 bar repressurise the system as described in section 4 1 NO R As pressure reduces Error Code 118 will begin to flash Once the pressure is less than 0 5 bar the boiler will not operate 118...

Страница 6: ...e shows information that can be displayed by pressing the button 2 Depending upon boiler model and any system controls connected to the appliance not all information codes will be displayed and some that are will not have a value 3 Press to return to the normal display Central Heating Temperature Adjustment R Display Screen R The button can be pressed so that the display shows the following inform...

Страница 7: ...while watching the pressure gauge carefully open the second tap 7 The system pressure is shown at all times on the gauge under the boiler and can be viewed on the display when there is power to the boiler 8 To check the water pressure press until is displayed This will alternate with the system pressure NOTE When the pump is running the gauge under the boiler may show a slightly different reading ...

Страница 8: ...ur boiler is installed in a compartment do not use it for storage purposes Do not obstruct any purpose provided ventilation openings 8 Flammable materials must not be stored in close proximity to your boiler 9 Avoid skin contact when your boiler is in operation as some surfaces may get hot e g pipework 10 Ensure that the flue terminal outside the house does not become damaged or obstructed particu...

Страница 9: ...nd holding for two seconds WARNING If an error code different from those described opposite appears on the display or a certain fault appears frequently contact heateam R R Table Of Error Codes R Central Heating NTC Fault Flue NTC Fault Central Heating Return NTC Fault Safety Thermostat Operated pump fault or air in primary Safety Thermostat Operated over temperature Primary System Water Pressure ...

Страница 10: ...egulations 1993 No 3083 and is deemed to meet the requirements of Directive 92 42 EEC on the energy efficiency requirements for new hot water boilers fired with liquid or gaseous fuels Type test for purpose of Regulation 5 certified by Notified Body 0085 Product Production certified by Notified Body 0086 Ref 86 BL 647 For GB IE only 7 2 Benchmark Commissioning Checklist 1 Please ensure that the in...

Страница 11: ... 999 Faulty boiler If it is known or suspected that there is a fault on the boiler that cannot be manually reset it must not be used until the fault has been corrected by a competent person Warning In an Emergency 1 If a water or gas leak occurs or is suspected the boiler can be isolated at the inlet valves by turning their taps through 90 1 4 turn downwards 2 Please contact your Installer Annual ...

Страница 12: ...he boiler If your installer confirms that the fault is with the boiler and he she can t repair it our friendly customer service team is on hand to help Simply call our service division heateam on 0844 241 2502 or e mail field trial uk bdrthermea com to book an engineer visit or for any general advice that you may need Our contact centre is open Monday to Friday 8am 6pm weekends and Bank Holidays 8...

Отзывы: