12
6.0 System Details
© Baxi Heating UK Ltd 2011
6.1
Information
1. The Main Combi Eco Condensing Combination Boiler is a
‘Water Byelaws Scheme - Approved Product’.
To comply with the Water Byelaws your attention is drawn to
the following installation requirements and notes (IRN).
a) IRN 001 -
See text of entry for installation
requirements and notes.
b) IRN 302 -
Byelaw 14.
2. Reference to the WRc publications, ‘Water fittings and
materials directory’ and ‘Water supply byelaws guide’ give full
details of byelaws and the IRNs.
6.2
Central Heating Circuit
1. The appliance is suitable for fully pumped SEALED
SYSTEMS ONLY.
Treatment of Water Circulating Systems
• All recirculatory water systems will be subject to corrosion
unless an appropriate water treatment is applied. This means
that the efficiency of the system will deteriorate as corrosion
sludge accumulates within the system, risking damage to
pump and valves, boiler noise and circulation problems.
• When fitting new systems flux will be evident within the
system, which can lead to damage of system components.
• All systems must be thoroughly drained and flushed out
using, for example, Sentinel X300 or X400 or Fernox F3.
They should be used following the flushing agent
manufacturer’s instructions.
• System additives - corrosion inhibitors and flushing
agents/descalers should comply to BS7593 requirements, e.g.
Sentinel X100 and Fernox MB-1 which should be used
following the inhibitor manufacturer’s instructions.
• Full instructions are supplied with the products, for further
information contact Sentinel (0800 389 4670) or Fernox
(0870 870 0362)
Failure to flush and add inhibitor to the system will
invalidate the appliance warranty.
• It is important to check the inhibitor concentration after
installation, system modification and at every service in
accordance with the manufacturer’s instructions. (Test kits are
available from inhibitor stockists.)
• For information or advice regarding any of the above
contact Technical Enquiries.
6.3
Bypass
1. The boiler utilises the primary side of the DHW plate heat
exchanger as an automatic integral bypass.
6.4
System Control
1. Further external controls (e.g. room thermostat) should be
fitted to optimise the economical operation of the boiler.
Содержание Main Combi 25 Eco
Страница 56: ...56 19 0 Notes Baxi Heating UK Ltd 2011 ...
Страница 57: ...57 19 0 Notes Baxi Heating UK Ltd 2011 ...