![Baxi ECOGEN 24/1.0 Скачать руководство пользователя страница 39](http://html1.mh-extra.com/html/baxi/ecogen-24-1-0/ecogen-24-1-0_installation-and-servicing-instructions-manual_2711788039.webp)
B) Retro installations operate the Ecogen with a new or existing external system wiring centre. This means that the installer has the option to retain an existing room thermostat,
DHW thermostat and programmer. An outdoor sensor for weather compensation cannot be used in this case. The THINK Controller must remain on the appliance (See
page 37
10.3 Complete Wiring Configuration
1. All wiring external to the appliance must be in accordance with I.E.E. BS 7671 requirements for Electrical Installations.
IMPORTANT: Before running the appliance ensure parameter 5700 has been set according to the type of system installed.
See
for system types and
for the change procedure.
* NOTE: All Fuses 3.15
A
** Permanent Live once the 230V supply is connected
*** Ensure all system wiring is correct to wiring regulations (BS7671) and fully tested before connection to avoid any damage to the appliance
controls.
page 38
10.4 YPlan with DHW cylinder sensor
1. The appliance MUST have a permanent Live/Neutral/Earth connection. The pump must be connected to the appliance as shown.
2. Set parameter 5700 to '2' for one heating circuit see
NOTE: It is not possible to operate a second heating circuit with a YPlan system. Intelligent Installations
Содержание ECOGEN 24/1.0
Страница 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Страница 70: ...page 70 16 2 Milligrid 24 way Connector...
Страница 71: ...page 71 16 3 14 way Connector...
Страница 72: ...page 72 16 4 Engine Circuit...
Страница 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Страница 74: ...page 74 16 6 External Connections External Wiring...
Страница 85: ...page 87...
Страница 86: ...page 88...
Страница 87: ...page 89 Section P...
Страница 88: ...page 90...
Страница 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Страница 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Страница 92: ...page 97...