Fig. 27 & Fig. 28
Fig. 29, Fig. 30 & Fig. 30a
9.3 Service connections
1. Connect the central heating circuit to the top of the appliance using 22 mm compression fittings to avoid heat damage to the case and seals; the return is on the left and
the flow is on the right.
NOTE: To assist with the purging of air from the system pour water into the flow
and return connections to displace the air in the heat exchangers.
2. Connect the gas to the bottom right of the appliance using the 15 mm gas cock provided (in the top of the packaging). Remove the bottom cover and lower the control tray
(See
). Install with the test nipple to the left (see
) this allows the connection to the appliance to be tightness tested
independently of the gas pipework up to the appliance which then can be tested using the test nipple on the gas meter. It may be difficult to reassemble the bottom panel if
this is not done.
3. Note: Care must be taken to ensure that the over current switch is not disturbed from its correct position (See
when replacing the bottom cover). The switch should
be up at the back the '1' should be depressed.
1. Connect the condensate drain to the trap outlet pipe.
Содержание ECOGEN 24/1.0
Страница 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Страница 70: ...page 70 16 2 Milligrid 24 way Connector...
Страница 71: ...page 71 16 3 14 way Connector...
Страница 72: ...page 72 16 4 Engine Circuit...
Страница 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Страница 74: ...page 74 16 6 External Connections External Wiring...
Страница 85: ...page 87...
Страница 86: ...page 88...
Страница 87: ...page 89 Section P...
Страница 88: ...page 90...
Страница 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Страница 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Страница 92: ...page 97...