
Fig. 2
Fig. 2a
page 8
3.0 Appliance Operation
3.1 Operating Mode (
1. With a demand for heating or hot water, the pump circulates water through the primary circuit. If the flow is 4.0 L/min or above the ignition sequence will start.
2. When the flow temperature reaches the set point temperature, a 5 minute delay occurs before the burner relights automatically (anticycling). The pump continues to run
during this period.
3. When the demand is satisfied the burner is extinguished and the pump continues to run for a period of 5 minute (Pump Overrun).
Содержание ECOGEN 24/1.0
Страница 69: ...Fig 77 Fig 78 Fig 79 page 69 16 0 Schematic Wiring 16 1 Burner Control Units BCU Connections...
Страница 70: ...page 70 16 2 Milligrid 24 way Connector...
Страница 71: ...page 71 16 3 14 way Connector...
Страница 72: ...page 72 16 4 Engine Circuit...
Страница 73: ...page 73 16 5 Power Monitoring 24Vdc Power Supply...
Страница 74: ...page 74 16 6 External Connections External Wiring...
Страница 85: ...page 87...
Страница 86: ...page 88...
Страница 87: ...page 89 Section P...
Страница 88: ...page 90...
Страница 89: ...page 91 Section Q Engine developing less than 950W after 15 minutes running at maximum rate...
Страница 91: ...page 93 page 94 page 95 page 96 MICRO CHP SYSTEM COMMISSIONING CHECKLIST...
Страница 92: ...page 97...