Carry out initial commissioning and any checks
necessary.
Explain the installation to the user.
If maintenance is necessary, warn the user of the
obligation to check the appliance and keep it in good
working order.
Give all the instruction manuals to the user.
1.3.3
User's liability
To guarantee optimum operation of the system, you
must abide by the following instructions:
Read and follow the instructions given in the manuals
provided with the appliance.
Call on a qualified professional to carry out installation
and initial commissioning.
Get your installer to explain your installation to you.
Have the required inspections and maintenance
carried out by a qualified installer.
Keep the instruction manuals in good condition close
to the appliance.
1 Safety
8
AS 300–2E BC
7724479 - v03 - 07102019
Содержание AS 300-2E BC
Страница 25: ...No Date Checks made Remarks By Signature 6 Maintenance 7724479 v03 07102019 AS 300 2E BC 25 ...
Страница 28: ...8 Appendix 28 AS 300 2E BC 7724479 v03 07102019 ...
Страница 29: ...8 Appendix 7724479 v03 07102019 AS 300 2E BC 29 ...
Страница 30: ...8 Appendix 30 AS 300 2E BC 7724479 v03 07102019 ...
Страница 32: ...7724479 v03 07102019 7724479 001 03 ...