Baxi 35/60 Скачать руководство пользователя страница 9

4.0 Clearances and Check List

9

4.1

Clearances around the Boiler

(Figs. 19 & 20)

1. The minimum clear spaces needed around

the boiler measured from the casing are as

follows:

Top

-

200mm

Bottom

-

200mm

Both sides

-

5mm

Front

-

5mm

(In Operation)

-

450mm

(For Servicing)

2. 

These areas must not be obstructed in any

way. Blocking the clearance spaces may

result in the boiler overheating and damage

may occur.

3. The gas burning compartment of your boiler is

completely sealed from the room in which it is

fitted. Products from the combustion of gas are

vented to the outside through the flue terminal

which must be kept free from obstruction as this

would interfere with the correct operation of the

boiler.

4. The boiler may be installed in a cupboard if

these minimum clearances are kept. The

compartment should be large enough to house

the boiler and ancillary equipment only.

5. 

IT SHOULD NOT BE USED AS A STORAGE

CUPBOARD.

4.2

Check List

1. If a fault develops, or is suspected, call your

Service Engineer as soon as possible.

2. Go through the following check list before you

make contact.

a)

Is the electricity supply on ?

b)

Is the selector switch in the On Position   

(giving a green “Power On” neon) ?

c)

Is the red “Flame Failure” neon lit ? 

Turn the On/Off/Reset selector fully anti- 

clockwise.

d)

Is the gas supply on ?

e)

Is the system pressure correct ?

f)

Is the boiler temperature control set high 

enough ?

g)

Is the time clock (if fitted) calling for heat ?

h)

Is the room thermostat (if fitted) set high 

enough ?

i)

Are the radiator valves open ?

200mm Min

780mm

450mm

200mm Min

5mm Min

5mm Min

5mm Min

450mm Min

For Servicing

Purposes

Fig. 19

Fig. 20

In Operation

Содержание 35/60

Страница 1: ...Baxi System 35 60 60 100 Gas Fired Wall Mounted System Boilers User s Operating Instructions Please keep these instructions safe Should you move house please hand them over to the next occupier ...

Страница 2: ...rks at Baxi has a commitment to quality because we know that satisfied customers mean continued success We hope you get a satisfactory service from Baxi If not please let us know Natural Gas Baxi System 35 60 G C No 41 075 18 Baxi System 60 100 G C No 41 075 19 Baxi is a BS EN ISO 9001 Accredited Company The boiler meets the requirements of Statutory Instrument The Boiler Efficiency Regulations 19...

Страница 3: ...Servicing must be performed by a competent person Your Installer or British Gas Service will be able to advise you 1 4 Electricity Supply 1 THIS APPLIANCE MUST BE EARTHED 2 A standard 230V 50Hz supply is required The appliance must be protected by a 3 amp fuse Never Hang Flammable Items Over The Appliance STANDARD B S 6891 B S 5440 Pt 1 B S 5440 Pt 2 B S 5546 B S 7074 B S 5449 B S 6798 SCOPE Gas I...

Страница 4: ...icating the temperature of the central heating water when constantly illuminated If a fault develops the appropriate neon will begin to flash Refer to Sections 3 3 to 3 7 30 40 50 60 70 80 2 1 0 4 3 bar Fig 3 30 40 50 60 70 80 1 On Off Reset Selector Switch 2 Central Heating Temperature Control 3 Central Heating System Pressure Gauge Neon Indicators 4 Flame Failure 5 Safety Thermostat Activated 6 ...

Страница 5: ... domestic hot water will be heated as demanded Fig 8 The hot water neon will illuminate The central heating will not operate even if timers room thermostat etc are calling for heat 6 Depending upon the system domestic hot water may be given priority when the selector switch is in Position i 7 The boiler will light automatically on demand 8 The orange burner on neon will illuminate when the boiler ...

Страница 6: ...domestic hot water thermostat set at 65 C As this temperature is approached the boiler automatically reduces the heat input until the burner is extinguished 3 The boiler will operate as controlled by the cylinder thermostat if the thermostat is set lower than 65 C 4 The temperature of the domestic hot water is not affected by the setting of the central heating temperature control knob Section 3 2 ...

Страница 7: ...n the or neon is illuminated a fault on the central heating or hot water temperature sensor is indicated Fig 11 Contact your Service Engineer 3 8 Pump Protection 1 With the selector switch in either Position i or Position ii Figs 13 14 the pump will automatically operate for 1 minute in every 24 hours to prevent sticking 3 9 Safety Thermostat 1 Your Baxi System 35 60 or 60 100 is fitted with an ad...

Страница 8: ...or switch Fig 18 electricity and gas supplies If your home is to be left unoccupied for long periods during cold weather the boiler and whole system should be drained unless there is additional frost protection 3 Your installer will advise you about frost protection and draining the system IMPORTANT When the selector switch is in the 0 Off position the electrical supply to the boiler is isolated T...

Страница 9: ... installed in a cupboard if these minimum clearances are kept The compartment should be large enough to house the boiler and ancillary equipment only 5 IT SHOULD NOT BE USED AS A STORAGE CUPBOARD 4 2 Check List 1 If a fault develops or is suspected call your Service Engineer as soon as possible 2 Go through the following check list before you make contact a Is the electricity supply on b Is the se...

Страница 10: ...n label on the back of the hinged lower door Fig 20 5 3 Guarantee 1 Your Baxi System 35 60 or 60 100 is designed and produced to meet all the relevant Standards 2 Baxi UK Limited provide a 12 month guarantee on the boiler The guarantee operates from the date installation is completed for the customer who is the original user 3 To maximise the benefit from our guarantee we urge you to return the re...

Страница 11: ...r the domestic heating market Gas Central Heating Boilers Wall Floor and Fireside models Independent Gas Fires Renewal Firefronts Gas Wall Heaters Solid Fuel Fires If you require information on any of these products please write telephone or fax to the Sales Department ...

Страница 12: ...Baxi UK Limited Brownedge Road Bamber Bridge Preston Lancashire PR5 6SN www baxi com After Sales Service 08706 096 096 Comp No 248545 Iss 2 9 01 921 765 1 ...

Отзывы: