Sailing yacht Bavaria 38
Bavaria Yachtbau GmbH
(
45
)
– 32 –
2.6 L.P.G. installation
The gas installation for the stove meets the European norm EN 10239. The test-certificate is attached.
The gas pipe leading to the stove from the standard 3 kg–gas cylinder is an 8 mm copper pipe. It is placed
into a self-bailing casing moulded into the deck in the rear cockpit area. All gas pipes have been installed
according to the German safety regulations. The best-by date for the soft connection hoses between the
gas cylinder and the copper pipe and between copper pipe and stove is printed onto the hoses. They have
to be replaced after the expiry date.
The reducing valve in the gas cylinder casing has a service pressure of 30 mbar. The flow rate is 1 kg/h.
2.6.1 The components (2 cabins)
38/2
1
Gasflasche mit Reduzierventil
Gas tank with valve
2
Gaskugelhahn
Gas Stopp cock
3
Gaskocher mit Backofen
Gas stove with oven
4 Gummischlauch
Rubber
hose
5
Kupferrohr 6/8
Copper tube 6/8
(3 cabins)
38/3
1
Gasflasche mit Reduzierventil
Gas tank with valve
2
Kupferrohr 6/8
Copper tube 6/8
3
Gaskocher mit Backofen
Gas stove with oven
4 Gummischlauch
Rubber
hose
5
Gaskugelhahn
Gas Stopp cock
Содержание BAVARIA 38
Страница 7: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 7...
Страница 8: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 8...
Страница 12: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 12 1 2 2 Deck arrangement...
Страница 26: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 26 2 5 6 Distribution of electric devices 2 cabins...
Страница 27: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 27 3 cabins...
Страница 29: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 29 2 5 7 Wiring plans...
Страница 30: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 30 2 5 8 Distribution plans...
Страница 31: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 31 2 5 9 AC distribution...
Страница 44: ...Sailing yacht Bavaria 38 Bavaria Yachtbau GmbH 45 44...