Startup and operation options with inserted memory card
Operation Manual
b maXX safe PLC
BMC-M-SAF-02
Document no.: 5.07020.04
Baumüller Nürnberg GmbH
74
11.9
m
Insert the memory card into the first slot of the CFI-01 CF module (see
page 38).
m
Set the S2 switch/button on the b maXX safe PLC to "RUN" (switch down).
m
Switch on the +24 V DC of the electrical supply.
After being switch on, the safety PLC will initially check if a safety project is present on
the CF module. If it is, the inquiry will then be made whether the project check sum is iden-
tical to the check sum of the safety project which is already present on the safety PLC. If
no safety project is present on the CF module, or the project check sums are identical,
the control will run up to the “RUN” status.
If the project check sums are not identical, the LED H3 (yellow) will blink and an entry from
the user will be waited for.
The user will now have to press the S1 button on the CF module and the S1 button on
channel 2 of the PLC at the same time:
m
A short push
of the button to transfer the project from the CF module to the control
(see
Data transfer from the card to the control
m
A long push
of the button (> 3 s) to copy the project from the control to the CF module
(see
Data transfer from the control to the card
11.9.3 Data transfer from the card to the control
Once the user has pushed the S1 button on the CF module and the S1 button on the
channel 2 of the PLC simultaneously for a short amount of time, the LED H3 (yellow) will
continue to blink and the safety PLC will wait for the release code (3-digit) to be entered.
The release code is the last 3 digits of the project check sum of the safety project, which
is displayed in the project information in ProSafety or, if a connection to the internet is
present, in the resource control to the safety PLC under “Info”.
Code entry:
1
The H5 7-segment display on channel 2 of the PLC shows a blinking display of the val-
ue of the S2 rotary switch of the CF module. The position of the code entry is displayed
with the LEDs H5 through H8 on the CF module. That means that the H5 will light up
first. In total, a 3-digit (max. 4-digit) code must be entered.
2
Setting the value with the S2 rotary switch on the CF module.
3
Confirm by pushing the S1 button on channel 2 and the S1 channel on CF module si-
multaneously.
4
The value of the S2 rotary switch will now be displayed steadily on the H5 7-segment
display.
5
After that, the second confirmation will be carried out be means of pushing the S1 but-
ton on channel 2 and the S1 channel on CF module simultaneously and the transition
to the next digit of the code entry will take place. The next digit will be displayed with
the LEDs H5 through H8 on the CF module. In the process, the user will have to com-
pare the position of the rotary switch with the value displayed. If an error is indicated in
the process, the safety control will have to be sent back to Baumüller for repairs.
Once the third code digit has been entered, the entry mode will be exited and LEDs H5
through H8 will go out.
If the pause during the entry process lasted longer than 10 seconds the process will be
aborted and will have to be restarted by briefly pushing the S1 button on the CF module
and the S1 button on channel 2 of the PLC simultaneously.
Содержание b maXX BMC-M-SAF-02
Страница 8: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 8 of 118 ...
Страница 16: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 16 of 118 ...
Страница 58: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 58 of 118 ...
Страница 82: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 82 of 118 ...
Страница 90: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 90 of 118 ...
Страница 92: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 92 of 118 ...
Страница 100: ...Operation Manual b maXX safe PLC BMC M SAF 02 Document no 5 07020 04 Baumüller Nürnberg GmbH 100 of 118 A ...
Страница 119: ......