6
|
Electrical installation
Baumer Hübner
28
Operating Manual
PMG10 & PMG10P SSI | V1
2
1
7
5
6
3
4
≤25 mm
4 mm
27 mm
24 mm
1
EMV ring
2
Cable shield
3
Second flange connector
4
First flange connector
5
Code
6
Round connector M23
7
Supply cable (ø7-12 mm)
Tools
n
24 mm
n
27 mm
n
Crimping or soldering tool (depending on connector)
Instruction:
a) Push cable through inside the housing and insulate.
b) Open the shield and place it around.
c) Insulate each individual strand.
d) Crimp or solder the contacts.
e) Snap in the contacts and lock the insulating body.
f) Place the shield around and cut in shape where necessary.
g) Push the plugin insert into the housing, mind the encoding groove.
h) Close and tighten.