 Assembly steps

  1. Assemble the complete boom with parts F3, B and C. You also need bolt 

N and nut O. Make sure the walkway is on upper side and the mast head 

is not upside down. 

  2. Place the completed boom in front of the base carrier and assemble it to 

the boom base. After this, all three hose support bars can be mounted. 

  3. The fall back prevention cylinders are mounted with pin N on the over-

carriage. Do not push the pin fully in for now. 

  4. Add the Hose rolling system to the overcarriage and fix it with the pin N 

from the fall back prevention cylinder. Just push both pins fully home. 

  5. On the Overcarriage‘s left side you can move all winches and find the 

keys to do so by removing the panel. 

  6. Unwinding about 1.5 m of rope from the small winch (pic 5 / 3), fill the 

pulley‘s from left to right and as shown on the picture. There is a fixing 

endpoint on the main body where you can secure the end of the rope.

    To make assembly easier, you use a piece of tape to fix the a-frame in

  a static position. 

  7. Add spring (I) and pin (J) to the already mounted cylinder. 

  8. To lift the boom to the upright position, assemble both pennant ropes 

with parts N, O and L. On the way up make sure the fall back prevention 

is located in the right position.

  9. To add the trench cutter to the base machine you will find a short piece 

of rope pre-assembled in the hook. This is just an assembly aid to rig the 

rope to the hook. 

 10. Remove about 1 m of rope from winch 1 through the mast head to the 

hook. Knot both ropes together. 

Anleitung_Bauer_MC96_HDS.indd   6

17.06.16   16:21

Содержание MC 96

Страница 1: ...MC Line MC 96 Seilbagger Anleitung_Bauer_MC96_HDS indd 1 17 06 16 16 21 ...

Страница 2: ...MC Line MC 96 Seilbagger Anleitung_Bauer_MC96_HDS indd 1 17 06 16 16 21 ...

Страница 3: ...protection 2x I Feder für Rückfallstütze spring for fall back protection 2x J Kolbenstande Rückfallstütze pin for fall back protection 2x K Scheinwerfer Kamera camera flood light 1x L Schloß für Mastabspannung pennant bracket 4x M Hohlniete rivet 2x N Schraube bolt 16x O Mutter nut 16x F1 Fräse mit Hydraulik und trench cutter with water and Waßerschläuchen hydraulic hoses F2 Schlauchaufrollsystem ...

Страница 4: ...C A F D E B O P N K Q I M G H L J F5 F1 F2 F3 F4 Anleitung_Bauer_MC96_HDS indd 3 17 06 16 16 21 ...

Страница 5: ...nehmba ren Abdeckung auf der linken Seite Ebenso die Öffnungen zum Bedienen der Winden 1 2 und 3 6 Nun ziehen Sie ca 1 5 m Seil von Winde 3 Um das Seil für die Mastver stellung leichter einscheren zu können sollte der A Bock dazu mit einem Klebeband fixiert werden Wie gezeigt wird das Seil von links nach rechts gezogen und geht von der Winde über den A Bock zum Oberwagen Das Seilende wird an einer...

Страница 6: ... die Seile in den Rollen am Rollenkopf getauscht werden Nun können die Hydraulikschläuche und der Förderschlauch über die gro ßen Rollen am Auslegerkopf geführt werden 14 Der Förderschlauch wird auf den Anschluß in der linken Trommel gescho ben und aufgewickelt Nun kann das Gegengewicht D montiert werden und der Auslaßhahn in die Halterung eingeklickt werden 15 Die Hydraulikschläuche werden in der...

Страница 7: ...o by removing the panel 6 Unwinding about 1 5 m of rope from the small winch pic 5 3 fill the pulley s from left to right and as shown on the picture There is a fixing endpoint on the main body where you can secure the end of the rope To make assembly easier you use a piece of tape to fix the a frame in a static position 7 Add spring I and pin J to the already mounted cylinder 8 To lift the boom t...

Страница 8: ...n the frame up to the lower drum on the mast head and then down to the Overcarriage drum on the left side looking from behind You can then assemble the counter weight and clip the short end of the conveying hose onto the holder 15 All hydraulic hoses start at the trench cutter right side through the hook on the frame and over the upper drum on the mast head before winding onto the right hand drum ...

Страница 9: ...1 2 3 4 5 C B F3 F5 F4 F5 M H M H F2 1 2 3 Anleitung_Bauer_MC96_HDS indd 8 17 06 16 16 21 ...

Страница 10: ...6 7 8 I H J O N L 2 4 3 1 Anleitung_Bauer_MC96_HDS indd 9 17 06 16 16 21 ...

Страница 11: ...10 9 13 11 12 Anleitung_Bauer_MC96_HDS indd 10 17 06 16 16 21 ...

Страница 12: ...14 15 16 17 D F G E K G Anleitung_Bauer_MC96_HDS indd 11 17 06 16 16 21 ...

Страница 13: ...MC Line BAUER Maschinen GmbH BAUER Straße 1 86529 Schrobenhausen Deutschland Tel 49 82 52 97 0 bma bauer de www bauer de bma bauer de Anleitung_Bauer_MC96_HDS indd 12 17 06 16 16 21 ...

Страница 14: ...protection 2x I Feder für Rückfallstütze spring for fall back protection 2x J Kolbenstande Rückfallstütze pin for fall back protection 2x K Scheinwerfer Kamera camera flood light 1x L Schloß für Mastabspannung pennant bracket 4x M Hohlniete rivet 2x N Schraube bolt 16x O Mutter nut 16x F1 Fräse mit Hydraulik und trench cutter with water and Waßerschläuchen hydraulic hoses F2 Schlauchaufrollsystem ...

Страница 15: ...C A F D E B O P N K Q I M G H L J F5 F1 F2 F3 F4 Anleitung_Bauer_MC96_HDS indd 3 17 06 16 16 21 ...

Страница 16: ...nehmba ren Abdeckung auf der linken Seite Ebenso die Öffnungen zum Bedienen der Winden 1 2 und 3 6 Nun ziehen Sie ca 1 5 m Seil von Winde 3 Um das Seil für die Mastver stellung leichter einscheren zu können sollte der A Bock dazu mit einem Klebeband fixiert werden Wie gezeigt wird das Seil von links nach rechts gezogen und geht von der Winde über den A Bock zum Oberwagen Das Seilende wird an einer...

Страница 17: ... die Seile in den Rollen am Rollenkopf getauscht werden Nun können die Hydraulikschläuche und der Förderschlauch über die gro ßen Rollen am Auslegerkopf geführt werden 14 Der Förderschlauch wird auf den Anschluß in der linken Trommel gescho ben und aufgewickelt Nun kann das Gegengewicht D montiert werden und der Auslaßhahn in die Halterung eingeklickt werden 15 Die Hydraulikschläuche werden in der...

Страница 18: ...o by removing the panel 6 Unwinding about 1 5 m of rope from the small winch pic 5 3 fill the pulley s from left to right and as shown on the picture There is a fixing endpoint on the main body where you can secure the end of the rope To make assembly easier you use a piece of tape to fix the a frame in a static position 7 Add spring I and pin J to the already mounted cylinder 8 To lift the boom t...

Страница 19: ...n the frame up to the lower drum on the mast head and then down to the Overcarriage drum on the left side looking from behind You can then assemble the counter weight and clip the short end of the conveying hose onto the holder 15 All hydraulic hoses start at the trench cutter right side through the hook on the frame and over the upper drum on the mast head before winding onto the right hand drum ...

Страница 20: ...1 2 3 4 5 C B F3 F5 F4 F5 M H M H F2 1 2 3 Anleitung_Bauer_MC96_HDS indd 8 17 06 16 16 21 ...

Страница 21: ...6 7 8 I H J O N L 2 4 3 1 Anleitung_Bauer_MC96_HDS indd 9 17 06 16 16 21 ...

Страница 22: ...10 9 13 11 12 Anleitung_Bauer_MC96_HDS indd 10 17 06 16 16 21 ...

Страница 23: ...14 15 16 17 D F G E K G Anleitung_Bauer_MC96_HDS indd 11 17 06 16 16 21 ...

Страница 24: ...MC Line BAUER Maschinen GmbH BAUER Straße 1 86529 Schrobenhausen Deutschland Tel 49 82 52 97 0 bma bauer de www bauer de bma bauer de Anleitung_Bauer_MC96_HDS indd 12 17 06 16 16 21 ...

Отзывы: