1) Manoeuvre bath into bathroom carefully.
2) Secure the 2 Bath feet supplied loose to the
plastic sockets underneath the bath.
3) Drill and affix Taps.
4) Fit waste, overflow and waste trap supplied.
5) Place bath in position and adjust to minimum
height.
Note: It is advisable to fix batten runs on to the
floor under the bath feet to avoid extending the
legs to far & to ensure feet sit squarely and flat.
On a wooden floor batten runs (3” x 2” minimum)
should be positioned squarely across the floor
boards to spread the load.
6) Level the bath in all planes using the 7 adjustable
feet & then lock the feet. Ensure the bath foot
under the doorway is cranked up to support the
foot well.
7) Mark wall fixings and plumbing runs.
8) Remove bath, drill in wall fixings where accessible
and run plumbing into position.
9) Re-position bath and fix to the floor via all four
bath-feet.
10) Connect plumbing. Refer to fitting guides for the
Thermostatic valve and Pump if supplied.
11) Test plumbing for leaks and pump operation.
12) Fill bath to maximum and leave for about 20
minutes to test door seal.
13) While the bath seal is being tested position and
trim to size the front and side panels.
14) Mark bottom of panels onto floor base. Fix battens
along floor behind panels.
15) Refit front and side panels. Drill through bottom
into batten and top into bath wooden frame. Push
fit panels onto the retaining clips prefitted on the
bath sides. Do not use Silicone sealant as this
prevents service access.
16) Silicone bath rims to walls as necessary.
17) Install shower screen following the instruction
sheet packed with the screen.
18) Finally drain bath and instruct customer on the use
of the bath.
2
STANDARD FITTING GUIDE
REFER TO THE 'USER GUIDE’ AND LEAVE THE COPY WITH CUSTOMER.
DO NOT LEAVE DOOR IN LOCKED POSITION ON COMPLETION. ADVISE CUSTOMER THAT THE DOOR
SHOULD BE LEFT UNLOCKED WHEN NOT IN USE IN ORDER TO PRESERVE THE SEAL.
April 2014
Made in UK