4.
Test the lift on dry ground using the Up/Down Switch
( # 9) and the Key Fob Transmitters. Inspect the
system for leaks.
1.
The Hydraulic Pump will arrive fully assembled. Make
s u re all the connections are snug to prevent leaks or
loss of power to the unit.
2.
Install two Group 31 Marine Grade Batteries as shown
a b ove.
Confirm that the POWER switch on the Control
Panel (#8) is OFF.
Connect the two solar panels to the
batteries as shown - each panel connects to one battery.
Connect the short Link Cable (#19) between the positive
terminal of one battery and the negative terminal of the
other. Connect the Red Battery Cable (#12) to the
positive terminal of the right battery and the Black Battery
Cable (#13) to the negative terminal of the left battery.
NOTE:
Ensure battery cables are correctly connected
and their terminals are tight (use pliers).
3.
Slide the Hydraulic Cylinder Hoses (#14) through the
a
c cess holes in the side of the White Fiberglass Box
(#10) and attach them to their corresponding
Quick Couplers (#4, #5).
Ensure each Quick Coupler is
completely seated and
tight
with
no gap at the connection joint.
Connection must be
tight
to open internal
check valve and allow fluid to flow. USE PLIERS
one
inch
hydraulic fluid level with
lift in DOWN position
only add fluid with lift
in DOWN position
H
y
d
ra
u
li
c
P
o
w
e
r
U
n
it
13
page 14
step
OIL INJECTED INTO THE SKIN FROM HIGH PRESSURE
LEAKS IN HYDRAULIC SYSTEMS CAN CAUSE SEVERE
INJURY. MOST DAMAGE OCCURS DURING THE FIRST
FEW HOURS. SEEK MEDICAL ATTENTION IMMEDIATELY.
SURGICAL REMOVAL OF OIL MAY BE NECESSARY.
Keep inside dry
2
NO GAP!
4
5
Tighten wingnuts on
batteries very tight.
Otherwise, cables
may overheat
during lift
operation.
NOTICE
19
+
+
From
Solar Panels
From
Solar Panels
Battery
Group 31
marine
deep cycle
Battery
Group 31
marine
deep cycle
From
Solar Panels
Isolation Diode
Isolation Diode
To Pump
To UP-DN Switch