24 VAC Universal Intermittent Pilot Gas Ignition Control
©
2018 BASO Gas Products
4
Part No. BASO-INS-C610UQRG, Rev. C
www.baso.com
SETUP AND ADJUSTMENTS
Vent Damper Jumper Plug
A vent damper jumper plug that jumpers pins 2 and 3 of the damper connection is
supplied with the control. The control will operate normally with this plug in place,
remove this plug to connect a vent damper. Once a vent damper has been connected
to the control, and the power cycled, an internal fuse will blow* and the control can then
only be used with a vent damper connected.
*Note:
It is normal to hear a defined pop when the fuse blows.
DIP Switch (S1) Settings
When replacing an existing ignition control with the C610U, refer to Table 2 for the
correct DIP switch settings. For a complete list of the controls the C610U replaces,
see the BASO C610U Installation Instructions available at
www.baso.com
.
The following timing parameters may be set with the 5-postion DIP switch
(see Table 2).
IMPORTANT:
The control timing configuration is
permanently
locked and cannot be reset by
changing the DIP switch settings after
10 consecutive power cycles.
FACTORY DEFAULT S1 DIP SWITCH SETTING
TIMING CONFIGURATION LABEL
All switch settings are defaulted from the factory to
the “ON’ position. Refer to Table 2 for the desired
timing configuration. The default timings are printed
on the label located on the front of the ignition.
Once you have selected the desired timing
configuration, using a permanent marker, write in the
values and mark the DIP switch settings on the label
provided. Adhere the label to the front of the control
for future reference.