Application 

The G93 valves are suitable for use with natural gas, 
Liquefied Petroleum (LP) gas, or LP gas-air mixtures. 
Typical applications include central heating units, unit 
heaters, commercial clothes dryers, and similar 
applications. 

Installation 

IMPORTANT:

 

Only qualified personnel should 

install or service BASO Gas Products products. 
These instructions are a guide for such personnel. 
Carefully follow all instructions in this document and 
all instructions for the appliance.

 

 

IMPORTANT:

 

Make all gas installations in 

accordance with applicable local, national, and 
regional regulations.

 

 

!

  CAUTION:

 

Risk of Electric Shock. 

Disconnect power supply before making electrical 
connections to avoid electric shock.

 

 

!

  WARNING:

 

Risk of Explosion or Fire. 

Shut off the gas supply at the main manual shutoff 
valve before installing or servicing the G93. Failure 
to shut off the gas supply can result in the release of 
gas during installation or servicing, which can lead to 
an explosion or fire, and may result in severe 
personal injury or death.

 

 

!

  WARNING:

 

Risk of Explosion, Fire, or 

Electric Shock. 

Label all wires before they are 

disconnected when replacing or servicing the G93. 
Wiring errors can cause improper or dangerous 
operation and may result in an explosion, fire, or 
electric shock leading to severe personal injury or 
death.

 

 

IMPORTANT:

 

Verify that the valve is installed 

only in applications where the specified maximum 
ambient (surface) temperature and maximum 
operating pressures will not exceed the limits in the 

Technical Specifications

 section.

 

 

To install the G93 valve: 

1.  Shut off power to the appliance. 

2.  Shut off the gas at the main manual shutoff valve. 

3.  Label each wire with the correct terminal 

designation prior to disconnection. 

4.  Compare the voltage on the valve with the power 

source voltage to ensure the correct unit is being 
installed. For valves with 25-volt coils, use a 
National Electrical Code (NEC), Class 2 
transformer. 

Note: 

The transformer must be mounted to a 
grounded metal enclosure. 

5.  Ensure that the gas flows through the valve body 

in the direction indicated by the arrow on the valve 
body. If the valve is installed with the gas flow in 
the opposite direction of the arrow, leakage can 
occur. 

IMPORTANT:

 

Do not use a wrench on any 

surface other than the casting flats provided at the 
inlet and outlet ends of the valve body. The G93 may 
be damaged in the mounting process if a wrench is 
used on any other surface. Using a wrench 
incorrectly may void the warranty.

 

Содержание BASOTROL B Series

Страница 1: ...sonal injury or death WARNING Risk of Explosion Fire or Electric Shock Label all wires before they are disconnected when replacing or servicing the G93 Wiring errors can cause improper or dangerous operation and may result in an explosion fire or electric shock leading to severe personal injury or death IMPORTANT Verify that the valve is installed only in applications where the specified maximum a...

Страница 2: ... the pipework 8 Thread pipe the amount shown in Table 1 for insertion into the control Do not thread the pipe too far Valve distortion or malfunction may result if the pipe is inserted too deep Table 1 NPT Pipe Thread Length into Valve Pipe Size NPT or BSPT Thread Pipe Amount in Maximum Depth Pipe in 1 2 3 4 1 2 3 4 13 16 3 4 9 For any threaded connections threads of pipe and nipples must be smoot...

Страница 3: ... the other pilot gas port to the pilot burner fitting See Figure 5 WARNING Risk of Explosion or Fire Never connect an external gas line to an internal pilot gas model Pilot gas would flow freely in one port and out the other which could lead to an explosion or fire and may result in severe personal injury or death WARNING Risk of Explosion or Fire Verify that there are no gas leaks by testing with...

Страница 4: ...93MODELREVB Rev www baso com Power Source Thermostat Pilot Burner Gas Line Thermocouple Lead BASO Power Unit Figure 4 Typical Installation for Internal Pilot Gas Flow Power Source Thermostat Thermocouple Lead BASO Power Unit Pilot Burner Gas Line Figure 5 Typical Installation Showing External Pilot Gas Flow ...

Страница 5: ... Table 2Table 2 Step by step procedures for these checks are included with the Y99AB 4 BASO Test Kit Application Note Part No BASO AN Y99AB 8 Observe at least three complete operating cycles to make sure that all components are functioning properly 9 Reset the thermostat to the desired setting before leaving the installation Note BASO recommends only BASO thermocouples that come from the original ...

Страница 6: ...e knob and turn the knob clockwise as far as it goes 2 Slowly push the adjustment plate in a counterclockwise direction while watching the size of the pilot burner flame 3 Stop moving the adjustment plate when the pilot flame reaches the proper size and tighten the round head screw The rotor pilot valve provides complete on off operation with the adjustment fixed at the On position Pilot Servicing...

Страница 7: ...mportant part of maintaining optimum and safe function of your BASO products Commercial cooking and other heating equipment can be a heavy cycling demand on gas safety controls The maintenance programs should include frequent checkout of the gas controls Review the procedure as described in the setup and adjustments and check for leakage section of the instructions Exposure to water chemicals dirt...

Страница 8: ...uefied Petroleum LP and LP gas air mixtures Packaging Bulk pack supplied to original equipment manufacturer individual pack optional Bulk Pack Quantity 32 Bulk Pack Weight 51 lb 23 kg Agency Listing CSA Certificate Number 229521 1656066 excludes G93H_ _ UL File Number MH2926 Specification Standards ANSI Z21 78 CSA 6 20 UL Standard 372 and 429 Performance specifications are nominal and conform to a...

Отзывы: