Страница 1: ...INSTRUCTION MANUAL FOR VOLTAGE PHASE SEQUENCE RELAY BE1 47N Publication 9170400990 Revision F 02 01 w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 2: ...this manual INTRODUCTION This Instruction Manual provides information concerning the operation and installation of BE1 47N Voltage Phase Sequence Relay To accomplish this the following is provided Spe...

Страница 3: ...ebruary 2001 It is not the intention of this manual to cover all details and variations in equipment nor does this manual provide data for every possible contingency regarding installation or operatio...

Страница 4: ...3 2 Outputs 3 2 Indicators 3 2 Targets 3 2 Power Supply 3 3 Power Supply Status Output 3 3 SECTION 4 INSTALLATION 4 1 General 4 1 Relay Operating Precautions 4 1 Dielectric Test 4 1 Mounting 4 1 Conn...

Страница 5: ...motor on the open phase However an induction motor with a starting current of 6 per unit will generate a negative sequence voltage of 16 if fully loaded when a fuse blows The negative sequence voltage...

Страница 6: ...d the packing list to ensure that they agree SAMPLE STYLE NUMBER Style number identification chart Figure 1 1 defines the electrical characteristics and operational features included in BE1 47N relays...

Страница 7: ...ac 5 0 W 12 0 VA Type R power supply initially requires 14 Vdc to begin operating Once operating the voltage may be reduced to 12 Vdc and operation will continue Target Indicators Magnetically latched...

Страница 8: ...0 1 to 9 9 seconds in increments of 0 1 seconds with an accuracy of 5 of the time selected Inverse Time Adjustable over the range of 01 to 99 in increments of 1 Accuracy within 5 or 50 ms whichever is...

Страница 9: ...mage or degradation of performance Isolation In accordance with IEC 255 5 and ANSI IEEE C37 90 one minute dielectric high potential tests as follows All circuits to ground 2121 Vdc Input to output cir...

Страница 10: ...ixteen position thumbwheel switch that provides adjustment of the UNDERVOLTAGE PICKUP point from 2 to 32 below nominal in increments of 2 Settings correspond to percentage levels as indicated on the f...

Страница 11: ...to percentage levels as indicated on the front panel M OVERVOLTAGE Indicator Red LED turns ON when system voltage exceeds the OVERVOLTAGE pickup setting N OVERVOLTAGE TIME DELAY Thumbwheel switch prov...

Страница 12: ...3 1 Functional Block Diagram VOLTAGE SENSING Negative Sequence Voltage Three phase system voltage is supplied to 120 208V 100 173V nominal 50 60 hertz potential transformers PTs These PTs are an integ...

Страница 13: ...rse Time Characteristic Curves Instantaneous Time is designated by a Time Delay setting of 00 Instantaneous response time is less than 50 milliseconds When evaluating inverse curves for the overvoltag...

Страница 14: ...BE1 47N Functional Description 3 3 w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 15: ...owing table Table 3 1 Wide Range Power Supply Voltage Ranges Power Supply Style Chart Identifier Nominal Voltage Voltage Range Low Range R 24 Vdc 12 to 32 Vdc Mid Range O P S 48 125 Vdc 120 Vac 24 to...

Страница 16: ...500 MULTIPLES OF PICK UP SETTING T I M E I N S E C O N D S 1 0 2 0 3 0 4 0 5 0 6 0 7 0 8 0 9 0 L A I D E M I T 01 02 03 05 07 10 20 30 40 50 60 80 99 D2818 17 07 31 98 Figure 3 2 Negative Sequence Vol...

Страница 17: ...3 6 BE1 47N Functional Description D2818 15 07 31 98 Figure 3 3 Undervoltage Inverse Time Characteristic Curves w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 18: ...BE1 47N Functional Description 3 7 D2818 16 07 31 98 Figure 3 4 Overvoltage Inverse Time Characteristic Curves w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 19: ...s relay is to be installed it is suggested that the connecting plugs of the relay be removed and the cradle withdrawn from the case so as not to produce false readings during the wiring insulation tes...

Страница 20: ...BE1 47N Installation 2 02 01 D1427 01 Figure 4 1 S1 Case Panel Drilling Diagram Semi Flush Mounting Figure 4 2 S1 Case Outline Dimensions Front View w w w E l e c t r i c a l P a r t M a n u a l s c...

Страница 21: ...ON OF WASHERS OVER THE BOSS TO TIGHTEN THE RELAY AGAINST THE PANEL CASE Figure 4 3 S1 Case Single Ended Semi Flush Mounting Outline Dimensions Side View Figure 4 4 S1 Case Single Ended Projection Moun...

Страница 22: ...ON OF WASHERS OVER THE BOSS TO TIGHTEN THE RELAY AGAINST THE PANEL CASE Figure 4 5 S1 Case Double Ended Semi Flush Mounting Outline Dimensions Side View Figure 4 6 S1 Case Double Ended Projection Moun...

Страница 23: ...BE1 47N Installation 4 5 Figure 4 7 S1 Case Single Ended Panel Drilling Diagram Rear View w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 24: ...4 6 BE1 47N Installation Figure 4 8 S1 Case Double Ended Panel Drilling Diagram Rear View w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 25: ...BE1 47N Installation 4 7 Figure 4 9 Semi Flush Mounting Outline Dimensions Rear View w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 26: ...4 8 BE1 47N Installation Figure 4 10 S1 Case Projection Mounting Outline Dimensions Rear View w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 27: ...te lead to the ground bus from each relay CONNECTIONS Incorrect wiring may result in damage to the relay Be sure to check model and style number before connecting and energizing the particular relay T...

Страница 28: ...4 10 BE1 47N Installation Figure 4 12 Sensing Input Connections w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 29: ...4 11 BE1 47N Installation Figure 4 13 Typical Internal Connection Diagram with Optional Output Contacts Normally Open w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 30: ...le phase verification test is offered as an adequate test that is easy to setup and execute This will confirm relay accuracy and calibration STEP 1 Adjust the NEGATIVE SEQUENCE PICKUP setting to the K...

Страница 31: ...PU V2L L VN VAB S 30 VN 3 Solving for VAB Magnitude VAB V2PU 3 VN where VN 120V for Sensing Input Range 3 208V for Sensing Input Range 5 20 V2 0 2 per unit V2 with Phase B shorted to Phase C For 120V...

Страница 32: ...l as the overvoltage 59 and the undervoltage 27 functions of the relay operate similarly and can be tested using the same philosophy In order to reduce the amount of redundant procedural steps only th...

Страница 33: ...e values are at 2 times actual pickup value STEP 5 Measure and record the interval from initiate to contact closure at case terminals 1 and 10 RESULT 47N Inverse Time should be 5 96 0 298 seconds Furt...

Страница 34: ...BE1 47N Testing 5 5 Figure 5 2 Test Circuit Diagram 27 59 w w w E l e c t r i c a l P a r t M a n u a l s c o m...

Страница 35: ...e entire relay cradle assembly preferably in its case IN HOUSE REPAIR Replacement parts can be purchased locally The quality of replacement parts must be at least equal to that of the original compone...

Страница 36: ...erence to Service Manual 9 1704 00 620 Added Phase Rotation Sensitivity to Section 1 Updated the Dielectric Test information Changed Input Voltage Range and Burden Data in Power supply table in Specif...