Figure 6. Test Setup Diagram
Figure 5
.
Interconnection Diagram, 480 Vac Generator
Страница 1: ...egulator automatically removes the field current after a time delay The time delay is inversely proportional to the magnitude of the detected field over voltage condition up to 95 5 Vdc point Beyond 9...
Страница 2: ...procedure checking wiring carefully b Start prime mover and bring up to rated speed RESULT The voltage should build up to less than nominal value c Slowly adjust the regulator voltage adjust V until t...
Страница 3: ...100mm 3 928 GROUND CONNECTION AT THIS MOUNTING HOLE 4mm 0 157 17mm 0 667 77mm 3 02 33mm 1 29 Figure 3 AEC 42 7 Outlined Diagram RESULT 1 Before fully CW is reached the light bulb should reach full bri...
Страница 4: ...Figure 6 Test Setup Diagram Figure 5 Interconnection Diagram 480 Vac Generator...