BGS technic KG
Bandwirkerstr. 3
D-42929 Wermelskirchen
Tel.: 02196 720480
Fax.: 02196 7204820
www.bgstechnic.com
© BGS technic KG, Copying and further use not allowed
INSTALLATION
The reel can be installed horizontally, vertically on the cement pillar, cement wall or steel structure.
1. Take out the unit and accessories from the box.
2. Choose a suitable place near a power supply.
3. Take the mounting bracket as a template to mark the position of the screws, and drill four holes in
the wall (fig. 1).
4. Fix the bracket (fig.1) by four 6 x 60 mm screws accordingly.
5. Slip the reel bracket (fig.2) to the mounting bracket and fasten it by 6 x 12 mm screw (fig. 3)
Fig.1
Fig.2
Fig.3
NOTE
•
The reel can be installed to a wall / post or ceiling.
•
It is suggested to mount the reel approximately 1 meter above the ground.
OPERATION
Connect the leader hose to the air pressure source.
UNWIND
Pull out the hose to desired length and stop after “tac tac” sound is heard.
ROLL UP THE HOSE
1. Release the lock by one more pull and let the hose back.
2. Please always hold the end of the hose when it is going back to the hose box.
3. Turn off the power.
STORAGE
Cleaning
The hose box is maintenance-free and must not be cleaned.
MAINTENANCE
When not in use, please disconnect from air pressure source.
When not in use for an extended period of time,
it is recommended to be stored in a cool and dry place.
TROUBLE SHOOTING
During the process of retracting / pulling out the hose, if the hose is locked, please pull out more hose
again, then retry the work.