Installation and connection
–
50
•
Power supply at +12 Volt, 2 Ampere.
•
Wires must be brought for connecting the lock and additional modules (optional).
Below is the designation of all contacts on the panel.
When connecting the panel panel by PoE,it is prohibited to power the lock using
panel's power. You must use a separate power supply, otherwise it may cause damage
to the device.
You can connect any type of electromechanical or electromagnetic lock
for which
the switched current does not exceed 5 Amps.