![BAS-IP AV-01KD Скачать руководство пользователя страница 20](http://html1.mh-extra.com/html/bas-ip/av-01kd/av-01kd_manual_4045778020.webp)
Installation and connection
–
20
Installation and connection
This page describes the process of installation and connection of the outdoor panel.
•
Completness check of the product
•
•
•
Connection of additional modules
Completness check of the product
Before installation of the outdoor panel, it is necessary to check that it is complete and all
components are available.
Outdoor panel kit includes:
Outdoor panel
1pc
Flush mounting bracket
1pc
Installation manual
1pc
Set of wires with connectors for connection of power supply, lock, and
additional modules
1pc
Set of end-caps for connections
1pc
Set screws with a wrench
1pc
Electrical connection
After verifying whether a device is complete, you can switch to the connection.
For connection you will need:
• An Ethernet UTP CAT5 or higher cable connected to a network switch/router.
• Power supply at + 12V, 2 amps.
• Wires must be brought for connecting the lock and additional modules (optional).
1. Connection scheme of electromechanical lock using external power supply for panel and the
lock.
Cable length recommendations
The maximum length of the UTP CAT5 cable segment should not exceed 100 meters,
according to the IEEE 802.3 standard.
You can connect any type of electromechanical or electromagnetic lock
for which
the switched current does not exceed 5 Amps.
Содержание AV-01KD
Страница 1: ...AV 01KD AV 01KD Exported on 08 12 2019...