![BAS-IP AA-07FB Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/bas-ip/aa-07fb/aa-07fb_user-manual_4028391003.webp)
3
Eng
Completeness check of the product
Before installation of the outdoor panel, it is necessary to check that
it is complete and all components are available.
Outdoor panel kit includes:
Outdoor panel
Manual
Flush mount bracket
Set of wires with connectors for connection of power supply,
lock, and additional modules
A set of plugs for connections
Set of set screws with a wrench
1 pc
1 pc
1 pc
1 pc
1 pc
1 pc
After verifying the device's completeness, you can switch to the outdoor panel
connection.
For connection you will need::
Electrical connection
An Ethernet UTP CAT5 or higher cable connected to a network
switch
/
router.
Cable length recommendations
The maximum length of the UTP CAT5 cable segment should not exceed 100 meters,
according to the IEEE 802.3 standard.
Power supply at +12 V, 2 amps.
Wires must be connected to connect the door sensor, the exit button
and the two locks control module (optional).
Содержание AA-07FB
Страница 1: ...USER MANUAL OUTDOOR PANEL AA 07FB...
Страница 7: ...7 Eng Notes...
Страница 9: ...9 1 1 1 1 1 1 Ethernet UTP CAT5 PoE UTP CAT5 100 IEEE 802 3 12 2...
Страница 11: ...1 2 3 4 5 6 7 8 9 0 T 143 353 61 141 351 60 351 141 239 143 353 109 130 c 155 375 55 11 1 2 3 4 5 6 7 8 9 0 T...
Страница 12: ...90 12 36 EAN 5060514914373 SILVER...
Страница 13: ...13 Notes...
Страница 14: ...Notes...
Страница 15: ...Notes...
Страница 16: ...www bas ip com...