The following is a checklist of the areas of the READY CARE LIFT that should be
inspected on a regular basis. It is recommended to inspect the lift monthly or bi-monthly.
This will depend on frequency of use. Any part which appears worn or wearing should be
replaced immediately for safety of caregiver and patient.
DATE
CARRIER SECTION
HEAD PROTECTORS
__________
ROTATION OF CARRIER SECTION
__________
SLING HOLDER
__________
HANGER SHAFT (CHECK FOR WEAR)
__________
MAIN PIVOT BOLT AND BUSHING (CHECK FOR WEAR)
__________
RAISING ARM
PIVOT BOLT
__________
HANDGRIPS __________
HANGER /SCALE PIVOT BOLT
__________
ELECTRIC ASSEMBLY
RAISES AND LOWERS SMOOTHLY
__________
HAND CONTROL
__________
BATTERIES __________
WEIGHT TESTED TO
__________
UNDERCARRIAGE
LEG LOCKING BOLTS
__________
LEG WIDENING ASSEMBLY
__________
LEG WIDENING ARMS
__________
CASTORS
__________
PAINT & CHROME
__________
BELTS OR SLINGS VISUAL
__________
ALL MOVING PARTS (I.E. BOLTS AND METAL BUSHINGS) SHOULD BE
LUBRICATED AT LEAST EVERY SIX MONTHS WITH LITHIUM GREASE.
MAINTENANCE
29
Содержание RCL-4002
Страница 1: ...Ready Care Lift RCL 4002 RCL 4500 RCL 6002 Operation Manual Model RCL 4002 Shown Rev A March 2007 ...
Страница 33: ......
Страница 35: ......
Страница 36: ......