background image

Scope: 

EXcite 

USER MANUAL 
BHB 125 / BHB 150 

g

 

Date: 

24.11.2014 

Rev.: 

Checked by: 

T.H. 

Approved by: 

EGT 

Page: 

Page 6 of 12 

Document no.: 

57-DSP-5 

 

 

WEB: 

www.bartec-technor.no

    PHONE: +47 51 84 41 00    E-MAIL: 

[email protected]

 

 

 

 

Fig. 3A – Single Unit 

 

 

 

 

Fig. 3B – Combined Unit 

Remove End Cover (Beacon Component) 

Unscrew the 4 (BHB 125) or 6 (BHB 150) M5 retained hex socket head screws of the Beacon Component 
(See fig. 3A/B). This will release the cover from the base and allow the cover to hang on the retaining wire 
strap. Before replacing the cover, check that the flameproof joints are clean and not damaged, the gasket is 
still retained in its groove. 

CAUTION

: Before removing the cover, ensure the power to the product is isolated. Remove the four pieces of 

M5 socket screws to open the cover. Twist the cover gently clockwise and anti-clockwise, whilst pulling away 
from the base until it comes off. Replace the cover in similar way, but operate in reverse manner as above.  

 

 

 

Содержание BHB 15

Страница 1: ...XPLOSION PROOF SOUNDER HORN BEACON BHB 125 BHB 150 ATEX Marking II 2GD Code EPL Gb Db Ex d IIC T4 T5 T6 Gb Ex tb IIIC TXXX C Marking Details Please note that every care has been taken to ensure the ac...

Страница 2: ...peaker and beacon is unique According to user control system 4 stages of alarm tones can be sent out from less critical stage stage 1 to the most critical stage stage 4 64 tones are selectable Tone ca...

Страница 3: ...ll only exist for a short time Gas Groupings Group IIA Propane Group IIB Ethylene Group IIC Hydrogen and Acetylene Equipment Category ATEX 2GD EPL Gb Db Temperature Range See label ref page 1 5 0 INST...

Страница 4: ...f the bracket see fig 1 The alignment and positions can be adjusted by loosening the two M8 screws which fastened the stainless steel bracket to the sounder The sounder should be positioned such that...

Страница 5: ...rtified cable glands are used and earthen correctly Ensure that only the right and certified stopping plugs are used to blank off unused gland entry points In order to maintain the IP rating of the pr...

Страница 6: ...n Component See fig 3A B This will release the cover from the base and allow the cover to hang on the retaining wire strap Before replacing the cover check that the flameproof joints are clean and not...

Страница 7: ...SINGLE UNIT DC LED Type See Fig 4 0 Power input DC 0 COM 24V Power input DC 24V S1 Switch 1 for alarm stage selection S2 Switch 2 for alarm stage selection Fig 4 Xenon Type see Fig 5 0 Power input DC...

Страница 8: ...see Fig 6 As same as above LED type in Single Unit See fig 6 Four Alarm Stages DC Type Stage 1 apply power supply to 0 COM and 24V Stage 2 apply power supply to 0 COM 24V and connect S1 to 0 COM Stag...

Страница 9: ...B to select flashing or rotary status including steady status Adjust the Potentiometer on the LED Beacon PCB see fig 4 for frequency adjustment For fastest stage frequency the potentiometer should be...

Страница 10: ...times min 120 times min 150 times min 1 0 90 times min 120 times min 150 times min 150 times min 10 0 CABLE GLAND The BHB series product has cable gland entries Only cable glands approved for Ex d app...

Страница 11: ...of the acids alkalis and chemicals If abnormal or unusual environmental conditions occur due to accident etc visual inspection is recommended To avoid electrostatic charge build up only exterior of t...

Страница 12: ...UAL BHB 125 BHB 150 g Date 24 11 2014 Rev A Checked by T H Approved by EGT Page Page 12 of 12 Document no 57 DSP 5 WEB www bartec technor no PHONE 47 51 84 41 00 E MAIL mail bartec technor no Table 1...

Отзывы: