BARRON Growlite GRM Скачать руководство пользователя страница 1

GRM

INSTALLATION INSTRUCTIONS

800.533.3948 • www.barronltg.com 

40070003 REV 3 - 10/18

1

INSTALLATION INSTRUCTIONS

CABLE MOUNTED

Ceiling

Screw Hole

Electric drill

Drill holes at desired location to 

mount steel cables.

1

Secure fixture to the end of the 

steel cables, using appropriate 

hardware.

3

Steel

Cable

Connect steel cables to ceiling, 

using appropriate hardware for 

mounting surface.

2

Adjust to desired height, clean off 

dust and debris.

4

IMPORTANT SAFEGUARDS

READ AND FOLLOW ALL SAFETY INSTRUCTIONS.

   When using electrical equipment, basic safety precautions should always be followed including the following:
•  

DISCONNECT AC POWER SUPPLY BEFORE SERVICING.

•  Installation and servicing of this equipment should be performed by qualified service personnel only.

•  Ensure the electricity connections conform to the National Electrical Code and local regulations if applicable.

•  Do not mount near gas or electrical heaters.

•  Equipment should be mounted in locations and at heights where it will not be readily subjected to tampering by    

   unauthorized personnel.

•  The use of accessory equipment not recommended by the manufacturer may cause an unsafe condition. 

 

•  Any modification or use of non-original components will void the warranty and product liability.

•  Do not use this equipment for other than intended use.

SAVE THESE INSTRUCTIONS!

Отзывы: