background image

STEP 1:

 

Mounting the post in position to suit desired opening

Maximum and Minimum opening spacing as shown on previous page.
Drill the mounting holes using the posts as a guide and bolt them into in place with appropriate fixings to ensure they 
are securely mounted.

STEP 2:

 

Insert assembled boom into the square receiver on the gate post as shown. 
Tighten hex retainer bolt to secure boom.

Operation Side

IP56_Installation Procedure - Telescopic Boom Gate   ©  Copyright 2019   

www.barriergroup.com.au

Отзывы: