background image

MANUAL SWING GATE

 Installation Procedure

IP36_Installation Procedure - MSG5000 ©  Copyright 2016   

www.barriergroup.com.au

Optional Mounting Post

& Receiver Post

Receiver Post

(C90)

Mounting Post

(C140 or CS150)

Important information.

Read carefully. 

Keep this information for further reference. 

WARNING 

The gate will not provide optimum performance unless it is installed correctly. For satisfactory gate operation please follow  

the instructions carefully. 

NOTE:

 No guarantee will be given or responsibility accepted by the manufacturers if the gate is not installed as instructed. 

Barrier Group 

do not

 warrant the work of 3rd party contractors.

BEFORE YOU START

1. The installer must ensure the desired mounting point for the gate is level, plumb and rigid. 

2. Use fixings appropriate to the material into which they are being fixed (not included).  

3. Check all parts are included. Contact Barrier Group immediately if you are missing a piece.

Maximum Clear Opening: 4850mm

Overall Length: 5215mm

Отзывы: