3
Determine the desired post placement. Make sure to line
up all the posts from the center (Fig. 1). Maximum span
of a level section is 68" between posts (72" on center).
(Fig. 2)
Fig. 1
Fig. 2
Post mounting
a. Posts are designed and manufactured to accept
3
⁄
33 8
⁄⁄ "
fasteners (sold separately). Be sure to use appropriate
fasteners for your installation.
b. Determine the desired rail placement and snap a
chalk line onto the mounting surface to ensure that all
posts are aligned properly (Fig. 3).
c. Plumb and level the posts using leveling shims
(included) (Fig. 4), secure the posts in place with
appropriate fasteners (sold separately) and install
base trims on each post (Fig. 5).
d. Determine the appropriate method for installing your
posts below.
Concrete Surface Installations:
a. Purchase four
3
⁄
33 8
⁄⁄ " masonry anchors according to local
building codes
b. Mark holes through mounting plate onto concrete
surface and follow masonry anchor manufacturer
installation instructions.
c. Install base trim sections around post. Take one side
of base trim and push plastic plugs through the hole
underneath. Take second half of base trim and push
together (Fig. 5).
1.
2.
68"
68"
72"
72"
72"
72"
Fig. 3
Chalk Line
Chalk Line
Deck
Deck
Mounting Plate
Mounting Plate
Mounting Plate
Mounting Plate
Mounting Plate
Mounting Plate
Mounting Plate
Mounting Plate
Mounting Plate
Mounting Plate
Mounting Plate
Mounting Plate
Mounting Plate
Fig. 4
Leveling Shim
Leveling Shim
Leveling Shim
Leveling Shim
Leveling Shim
Post
Post
Level
Level
Fig. 5
Base trim
Base trim
Содержание ELEVATION
Страница 31: ...31 ...