background image

4

4

5

6

7

When included in kit, place aluminum insert into bottom 
rail, then insert bottom rail into bottom post route hole 
of fi rst post only (Fig. 5). Panels with 7" rails do not 
require aluminum inserts.

Attach U-channels to two end boards (Fig. 6).

NOTE:

Attach U-Channel to "tongue" side of fi rst board, and 
"goove" side of last board.

Insert boards into bottom rail ensuring U-channels are 
on both ends. Start from fi rst installed post and work 
towards second post (Fig. 7).

For Full Privacy Panels:

Insert the top rail into the fi rst top hole post route then 
guide over top of boards (Fig. 8). 

Proceed to Step 15.

Fig. 5

Fig. 6

Fig. 7

Fig. 8

U-Channel

U-Channel

First

Board

Last

Board

Содержание Bolton 73025736

Страница 1: ...Vinyl Fence Ready to Assemble Privacy Vinyl Fence Ready to Assemble FREEDOM WEB Read all instructions prior to installing product Refer to manufacturers safety instructions when operating any tools To register your product please visit freedomproduct com ...

Страница 2: ...water lines to avoid puncturing any unseen underground utilities WARNING Improper installation of this product can result in personal injury Always wear safety goggles when cutting drilling and assembling the product Incorrect installation may cause harm to the product or individual Check local building codes to determine pool safe fencing options NOTICE DO NOT attempt to assemble the kit if parts...

Страница 3: ...eters based on post size 10 for 5 x 5 post 8 for 4 x 4 post Fig 2 5x5 Post 5x5 Post Example Example Frost Line Gravel Filler 6 10 X Y Y X Fig 3 Insert 6 of gravel filler into the bottom of both holes and then set both posts into the ground and level the first post Add wet or dry concrete mix according to manufacturer s instructions to the top of the first post hole Make sure panel will be 2 above ...

Страница 4: ...boards Fig 6 NOTE Attach U Channel to tongue side of first board and goove side of last board Insert boards into bottom rail ensuring U channels are on both ends Start from first installed post and work towards second post Fig 7 For Full Privacy Panels Insert the top rail into the first top hole post route then guide over top of boards Fig 8 Proceed to Step 15 Fig 5 Fig 6 Fig 7 Fig 8 U Channel U C...

Страница 5: ...e Insert Lattice Finally add the completed top assembly into the route holes of the first post Fig 10 Proceed to Step 15 For Closed Top Panels Insert pickets into middle rail Fig 11 Fig 10 Fig 11 Middle Rail Pickets Guide top rail over picket tops Fig 12 Fig 12 Top Rail Top Rail Finally add the completed top assembly into the route holes of the first post Fig 13 Proceed to Step 15 Fig 13 ...

Страница 6: ...TE Scalloped and Arched panels have pickets boards that are numbered Start from left side with the 1 picket board first Fig 14 Fig 15 Apply glue on inside rim of post tops then attach to posts Fig 17 Repeat these steps until completed Fig 17 Insert the completed fence panel into the route holes of the second fence post Plumb and level the post and add concrete according to manufacturers instructio...

Страница 7: ...BARRETTE OUTDOOR LIVING 7830 FREEWAY CIRCLE MIDDLEBURG HEIGHTS OHIO 44130 TEL 888 418 4400 WWW FREEDOM BARRETTEOUTDOORLIVING COM ...

Отзывы: