5
5
For Build-It-Yourself panel, insert aluminum into bottom rail, then
ourself panel, insert aluminum into bottom rail, then
insert bottom rail into bottom post route hole of first post onl
insert bottom rail into bottom post route hole of first post only.
6
Next, attach U-Channels to boards.
Next, attach U-Channels to boards.
If assembling Red Cedar panels, you must screw U-Channels
If assembling Red Cedar panels, you must screw U-Channels
to post first and then add boards.
to post first and then add boards.
7
Insert boards into bottom rail ensuring U-Channels are on both ends.
Insert boards into bottom rail ensuring U-Channels are on both ends.
8
Add the lattice insert over the top
Add the lattice insert over the top of the lattice.
Place into the middle rail followed by the top rail.
Place into the middle rail followed by the top rail.