1320/1620 Owner’s-Operator’s Manual
8/30/18
Page 2 of 19
TABLE OF CONTENTS
TILLER ASSEMBLY INSTRUCTIONS
2
SERVICE INFORMATION
3
BARRETO WARRANTY
4
HOUR METER
4
HONDA GX390 SCHEMATIC
5
BRIGGS 16 HP SCHEMATIC
6
HYDRAULIC SCHEMATIC
7
SPECIFICATIONS
8
TROUBLESHOOTING
9
OPERATING INSTRUCTIONS
12
SAFETY INSTRUCTIONS
13
SAFETY INSTRUCTIONS OVERVIEW
14
LOCATION OF UNDERGROUND UTILITIES
16
WORKSITE ASSESSMENT
17
CONTACT WITH UNDERGROUND UTILITIES
18
INDEX
19
ASSEMBLY INSTRUCTIONS
1.
Remove the tiller from the shipping crate. Please inspect immediately for any damage and
notify the shipping company and Barreto Manufacturing, Inc. right away if any is found.
2.
Screw the handle bar adjustment crank into the lower handle bar adjuster pin.
3.
Fasten the handle bar to the tiller using the 1/2" x 3" bolt supplied.
4. Adjust the clutch cable by removing all slack in the lever.
5. Check the reservoir according to instructions in the service information on the following page.
6. Fill the engine with fuel and oil according to the engine manual.
7. Free wheel hubs: Pull one freewheeling pin slightly, using the split ring. Rotate the pin until
the 1/8" diameter roll pin aligns with the slot in the mounting plate. Allow the pin to slide
through the slot. Repeat for the other wheel. Roll the tiller until each pin drops into a hole in
the hub. The hubs are now locked.
8. Uncoil the wire for the remote engine on/off switch. Route the wire along the clutch cable
to the engine and secure with the cable ties provided. Splice this wire to the kill switch wire
on the engine with the electrical splice provided.
9. When documentation refers to “right side” or “left side”, it is relative to the operator’s
position with both hands on the handlebars.