9
Visually check for any physical damage to the shipping
container. Inspect the equipment surfaces that are adja-
cent to any damaged area. Open the furnace door and re-
move packing material from inside the furnace chamber.
Vacuum the chamber prior to use to remove the insulation
dust due to shipping.
The furnace is supplied with two hearth plates. Place the
hearth plates on the bottom of the chamber.
Install ceramic sleeve into top vent hole on furnace case.
Retain the original packaging material if re-shipment is
foreseen or required.
Unpacking
Содержание F62730
Страница 42: ...42 Wiring Diagrams Single Setpoint w OTP Control SW1172X1 SW1172X1 SW1172X1 SW1172X1...
Страница 43: ...43 WIRING DIAGRAMS 8 Segment Programmable Control SW1172X1 SW1172X1 SW1172X1...
Страница 49: ...49 TITLE RIGHT...
Страница 50: ...50...
Страница 51: ...51...
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......