background image

Manual   2100-361
Page    5

CONDENSATE DRAIN

A plastic drain hose extends from the drain pan at the top
of the unit down to the unit base.  There are openings in
the unit base for the drain hose to pass through.  In the
event the drain hose is connected to a drain system of
some type, it must be an open or vented type system to
assure proper drainage.

NOTE:  If no return air duct is used, applicable installation

codes may limit this cabinet to installation only in
a single story structure.

Any grille that meets with 5/8 inch louver criteria may be
used.  It is recommended that Bard Return Air Grille Kit
RG2 through RG5 or RFG2 through RFG5 be installed
when no return duct is used.  Contact distributor or
factory for ordering information.  If using a return air
filter grille, filters must be of sufficient size to allow a
maximum velocity of 400 fpm.

A 1/4 inch clearance to combustible material for the first
three feet of duct attached to the outlet air frame is
required.  See Wall Mounting Instructions and Figures 3
and 3A for further details.

Ducts through the walls must be insulated and all joints
taped or sealed to prevent air or moisture entering the
wall cavity.

Some installations may not require any return air duct.  A
metallic return air grille is required with installations not
requiring a return air duct.  The spacing between louvers
on the grille shall not be larger than 5/8 inch.

Design the duct work according to methods given by the
Air Conditioning Contractors of America (ACCA).
When duct runs through unheated spaces, it should be
insulated with a minimum of one inch of insulation.  Use
insulation with a vapor barrier on the outside of the
insulation.  Flexible joints should be used to connect the
duct work to the equipment in order to keep the noise
transmission to a minimum.

Содержание WL7013A0Z

Страница 1: ...IONS WALL MOUNTED PACKAGE AIR CONDITIONERS MODEL WL7013 Manual 2100 361 Supersedes File Volume III Tab 16 Date 01 26 2000 Bard Manufacturing Company Bryan Ohio 43506 Since 1914 Moving ahead just as pl...

Страница 2: ...Rated ESP 15 Table 9 Maximum ESP of Operation Electric Heat Only 15 Table 10 Pressure Table 16 Getting Other Information and Publications 1 Wall Mount General Information 2 Air Conditioning Wall Mount...

Страница 3: ...Manual D Winter and Summer Air Conditioning and Equipment Selection For more information contact these publishers ACCA Air Conditioning Contractors of America 1712 New Hampshire Ave N W Washington DC...

Страница 4: ...U T B 0 9 7 1 2 0 0 6 0 3 7 8 1 0 3 0 3 2 0 0 1 6 1 4 0 3 1 4 3 2 6 3 0 0 6 5 2 MODEL NUMBER CONTROL MODULES CAPACITY 60 5 Ton VOLTS PHASE A 230 208 60 1 B 230 208 60 3 REVISIONS KW VENTILATIONOPTIONS...

Страница 5: ...Manual 2100 361 Page 3 FIGURE 1 UNIT DIMENSIONS MIS 1456...

Страница 6: ...ould be checked for external signs of shipping damage If damage is found the receiving party must contact the last carrier immediately preferably in writing requesting inspection by the carrier s agen...

Страница 7: ...ient size to allow a maximum velocity of 400 fpm A 1 4 inch clearance to combustible material for the first three feet of duct attached to the outlet air frame is required See Wall Mounting Instructio...

Страница 8: ...that a 1 inch clearance is used for ease of installation and maintaining the required clearance to combustible material The supply air opening would then be 32 x 12 See Figures 2 and 3 for details WAR...

Страница 9: ...Manual 2100 361 Page 7 FIGURE 2 MOUNTING INSTRUCTIONS MIS 1445...

Страница 10: ...RNING A minimum of 1 4 inch clearance must be maintained between the supply air duct and combustible materials This is required for the first 3 feet of ducting It is important to insure that the 1 4 i...

Страница 11: ...L FRAMING MATERIAL 2 X 4 S 2 X 6 S AND OR STRUCTURAL STEEL THIS STRUCTURAL MEMBER LOCATED TO MATCH STUD SPACING FOR REST OF WALL A SECOND MEMBER MAY BE REQUIRED FOR SOME WALLS RETURN DUCT OPENING SUPP...

Страница 12: ...Manual 2100 361 Page 10 FIGURE 6 COMMON WALL MOUNTING INSTALLATIONS MIS 550...

Страница 13: ...ive 5 wires should be run from thermostat subbase to the 24V terminal board in the unit A five conductor 18 gauge copper color coded thermostat cable is recommended The connection points are shown in...

Страница 14: ...Manual 2100 361 Page 12 FIGURE 7 UNIT 24V TERMINAL BOARD MIS 1373...

Страница 15: ...nstallation connecting properly phased power leads to the same Fusite terminal should maintain proper rotation direction The direction of rotation of the compressor may be changed by reversing any two...

Страница 16: ...e due to phase reversal The phase monitor in this unit is equipped with two LEDs If the Y signal is present at the phase monitor and phases are correct the green LED will light If phases are reversed...

Страница 17: ...E 6 INDOOR BLOWER PERFORMANCE CFM 230V P S E H n I 2 O 3 1 0 7 L W d e e p S h g i H l i o C y r D l i o C t e W 0 1 2 5 7 7 1 5 7 6 1 5 7 5 1 0 0 6 1 5 2 5 1 5 2 4 1 TABLE 8 RATED CFM AND ESP 1 Rated...

Страница 18: ...2 7 2 2 7 9 8 2 3 7 5 0 3 4 7 4 2 3 5 7 3 4 3 B D g e d 0 8 B W g e d 7 6 e d i S w o L e d i S h g i H 3 7 0 2 2 3 7 4 3 2 4 7 8 4 2 5 7 3 6 2 6 7 9 7 2 7 7 6 9 2 8 7 3 1 3 9 7 2 3 3 0 8 2 5 3 B D g...

Отзывы: