background image

BARD MANUFACTURING COMPANY
Bryan, Ohio  43506

Since 1914...Moving ahead, just as planned.

Manual:

2100-308A

Supersedes: 2100-308
File:

Volume III, Tab 19

Date:

02-15-2000

INSTALLATION INSTRUCTIONS

MODELS:

WERV-A5B
WERV-C5B

WALL MOUNT

ENERGY RECOVERY VENTILATOR

 WITH EXHAUST

For Use With Bard

3-1/2 Thru 5 Ton

Wall Mount

 Air Conditioners

and Heat Pumps

Содержание WERV-A5B?WERV-C5B

Страница 1: ...st as planned Manual 2100 308A Supersedes 2100 308 File Volume III Tab 19 Date 02 15 2000 INSTALLATION INSTRUCTIONS MODELS WERV A5B WERV C5B WALL MOUNT ENERGY RECOVERY VENTILATOR WITH EXHAUST For Use...

Страница 2: ...stallation Factory Installed Versions 12 Control Wiring 12 Control Requirements 12 Recommended Control Sequences 12 Ventilation Air Flow 12 Maintenance Procedures 16 Figures Figure 1 4 Figure 2 5 Figu...

Страница 3: ......

Страница 4: ......

Страница 5: ......

Страница 6: ......

Страница 7: ......

Страница 8: ......

Страница 9: ......

Страница 10: ......

Страница 11: ......

Страница 12: ......

Страница 13: ......

Страница 14: ......

Страница 15: ......

Страница 16: ......

Страница 17: ......

Страница 18: ......

Страница 19: ......

Страница 20: ......

Отзывы: