START UP

IMPORTANT INSTALLER NOTE

For improved start up performance wash the indoor coil
with a dish washing detergent.

HIGH PRESSURE SWITCH

The WA381, WA484, WA491 and WA602 models are
supplied with a remote reset high pressure switch.  If
tripped, this pressure switch may be reset by turning the
thermostat off then back on again.

THREE PHASE SCROLL COMPRESSOR
START UP INFORMATION

Scroll compressors, like several other types of
compressors, will only compress in one rotational
direction. Direction of rotation is not an issue with
single phase compressors since they will always start
and run in the proper direction.

However, three phase compressors will rotate in either
direction depending upon phasing of the power.  Since
there is a 50-50 chance of connecting power in such a
way as to cause rotation in the reverse direction,
verification of proper rotation must be made.
Verification of proper rotation direction is made by
observing that suction pressure drops and discharge
pressure rises when the compressor is energized.
Reverse rotation also results in an elevated sound level
over that with correct rotation, as well as, substantially
reduced current draw compared to tabulated values.

Verification of proper rotation must be made at the
time the equipment is put into service. If improper
rotation is corrected at this time there will be no
negative impact on the durability of the compressor.
However, reverse operation for over one hour may have
a negative impact on the bearing due to oil pump out.

NOTE: If compressor is allowed to run in reverse

rotation for several minutes, the compressor’s
internal protector will trip.

All three phase ZR compressors are wired identically
internally. As a result, once the correct phasing is
determined for a specific system or installation,
connecting properly phased power leads to the same
Fusite terminal should maintain proper rotation
direction.

The direction of rotation of the compressor may be
changed by reversing any two line connections to the
unit.

PHASE MONITOR

All units with three phase scroll compressors are
equipped with a 3 phase line monitor to prevent
compressor damage due to phase reversal.

The phase monitor in this unit is equipped with two
LEDs.  If the Y signal is present at the phase monitor
and phases are correct the green LED will light.

If phases are reversed, the red fault LED will be lit and
compressor operation is inhibited.

If a fault condition occurs, reverse two of the supply
leads to the unit.  Do not reverse any of the unit factory
wires as damage may occur.

CONDENSER FAN OPERATION

The condenser fan motor on 230/208 volt, one and
three phase, 60 HZ units is a two speed motor that
comes factory wired on high speed for peak
performance.  If ambient conditions permit, it can be
reconnected to low speed (red wire) for lower sound
level.  See wiring diagram.

50 HZ models must have fan wired on low speed.
These models are factory wired on low speed.

SERVICE HINTS

1. Caution homeowner to maintain clean air filters at

all times. Also, not to needlessly close off supply
and return air registers.  This reduces air flow
through the system, which shortens equipment
service life as well as increasing operating costs.

2. Switching to heating cycle at 75° F or higher

outside temperature may cause a nuisance trip of
the remote reset high pressure switch. Turn
thermostat off then on to reset the high pressure
switch.

3. Check all power fuses or circuit breakers to be sure

they are the correct rating.

4. Periodic cleaning of the outdoor coil to permit full

and unrestricted airflow circulation is essential.

Содержание WA381

Страница 1: ...OUNTED PACKAGE AIR CONDITIONERS MODELS WA381 WA423 WA484 WA491 WA602 Manual 2100 398 Supersedes File Volume III Tab 16 Date 01 28 02 Bard Manufacturing Company Bryan Ohio 43506 Since 1914 Moving ahead...

Страница 2: ...Table 9 Maximum EXP Electric Heat Only 17 Table 9A Maximum EXP Electric Heat Only 17 Table 10 Pressure Table 18 Table 11 Optional Accessories 19 Getting Other Information and Publications 1 Wall Moun...

Страница 3: ...Manual D Winter and Summer Air Conditioning and Equipment Selection FOR MORE INFORMATION CONTACT THESE PUBLISHERS ACCA Air Conditioning Contractors of America 1712 New Hampshire Ave N W Washington DC...

Страница 4: ...3 2 6 3 0 0 6 5 2 5 1 5 2 6 0 0 2 1 5 0 4 5 0 0 4 8 3 2 6 3 0 0 2 1 5 2 1 3 0 0 4 8 3 3 7 1 0 0 0 7 4 8 1 3 3 4 0 3 4 1 6 5 7 3 0 0 1 6 4 0 2 2 3 8 0 6 2 8 6 1 2 7 0 0 2 1 5 KW MODEL NUMBER CONTROL MO...

Страница 5: ...y l p p u S n r u t e R E F G I J K L M N O P Q R S T A B C B 8 3 A W 2 4 A W 8 4 A W 9 4 A W 0 6 A W 5 7 0 2 4 2 3 4 2 2 5 7 8 4 8 8 8 9 8 8 9 2 8 8 5 1 8 8 9 2 8 8 3 4 0 1 9 1 6 6 1 3 0 0 0 3 8 6 2...

Страница 6: ...1 8 0 2 0 3 2 1 1 1 2 r o 1 2 r o 1 5 3 5 3 9 5 5 8 0 1 1 0 5 0 5 0 6 0 9 0 1 1 8 8 6 4 2 0 1 0 1 0 1 8 6 A N A N A N 6 5 6 5 A N A N A N 6 2 2 5 A N A N A N 0 6 0 6 A N A N A N 0 3 0 6 A N A N A N 6...

Страница 7: ...sdiction should be consulted before the installation is made See Page 1 for information on codes and standards Size of unit for a proposed installation should be based on heat loss calculation made ac...

Страница 8: ...requirement of the equipment Air Conditioning Contractors of America ACCA is an excellent guide to proper sizing All duct work or portions thereof not in the conditioned space should be properly insu...

Страница 9: ...l If a combustible wall use a minimum of 30 1 2 x 10 1 2 dimensions for sizing However it is generally recommended that a 1 inch clearance is used for ease of installation and maintaining the required...

Страница 10: ...Manual 2100 398 Page 8 FIGURE 3 MOUNTINGINSTRUCTIONS MIS 416...

Страница 11: ...NING A minimum of 1 4 inch clearance must be maintained between the supply air duct and combustible materials This is required for the first 3 feet of ducting It is important to insure that the 1 4 in...

Страница 12: ...STRUCTURE FACTORY SUPPLIED RAIN FLASHING MOUNT ON UNIT BEFORE INSTALLATION SEE UNIT DIMENSIONS FIGURE 1 FOR ACTUAL DIMENSIONS ATTACH TO TOP PLATE OF WALL 1 000 CLEARANCE ALL AROUND INTERIOR FINISHED...

Страница 13: ...Manual 2100 398 Page 11 FIGURE 7 COMMONWALLMOUNTINGINSTALLATIONS FREE AIR FLOW NO DUCT DUCTED SUPPLY RETURN AT UNIT FALSE WALL INSTALLATION CLOSETINSTALLATION MIS 550...

Страница 14: ...on on three phase scroll compressor start ups WIRING LOW VOLTAGE WIRING 230 208V 1 phase and 3 phase equipment dual primary voltage transformers All equipment leaves the factory wired on 240V tap For...

Страница 15: ...Manual 2100 398 Page 13 FIGURE 8 UNIT 24V TERMINAL BOARD MIS 1373A...

Страница 16: ...identically internally As a result once the correct phasing is determined for a specific system or installation connecting properly phased power leads to the same Fusite terminal should maintain prope...

Страница 17: ...e Recycling the wall thermostat resets the manual lockout Low Pressure Switch Bypass and Lockout Sequence If the low pressure switch opens for more than 120 seconds the compressor contactor will de en...

Страница 18: ...ycle TABLE 6 REFRIGERANTCHARGE l e d o M d e t a R w o l f r i A D O 5 9 e r u t a r e p m e T D O 2 8 e r u t a r e p m e T 1 8 3 A W 0 0 1 1 8 4 0 5 6 4 8 4 3 2 4 A W 0 0 4 1 4 5 2 5 6 6 4 6 4 8 4 A...

Страница 19: ...S w o L d e e p S 5 0 A 0 1 A 5 1 A 0 2 A 0 5 0 5 0 5 0 5 0 5 0 5 0 5 5 4 0 5 0 5 0 5 0 5 0 5 0 5 0 5 5 4 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 4 0 0 B 9 0 B 5 1 B 8 1 B 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0 5 0...

Страница 20: ...2 1 8 3 7 2 2 8 0 9 2 3 8 8 0 3 4 8 6 2 3 5 8 6 4 3 B D g e d 5 8 B W g e d 2 7 e d i S w o L e d i S h g i H 8 7 9 1 2 0 8 4 3 2 1 8 9 4 2 3 8 6 6 2 4 8 3 8 2 5 8 0 0 3 6 8 9 1 3 7 8 7 3 3 8 8 8 5 3...

Страница 21: ...r e t a e H X X 5 P O B 5 D A F B 5 D A F M e t a l P f f O k n a l B r e p m a D r i A h s e r F c i r t e m o r a B r e p m a D r i A h s e r F d e z i r o t o M X X X X X X X X X X X X X X X X X X...

Отзывы: