TROUBLESHOOTING  GE  ECM

 MOTORS CONT’D.

Motor

Motor OK when

R > 100k ohm

ECM 2.0

Only remove

Hex Head Bolts

Connector Orientation

Between 4 and 8 o'clock

Drip Loop

Back of

Control

Figure 5

Winding Test

Figure 4

Note:              
Use the shorter 
bolts and 
alignment pin 
supplied when 
replacing an 
ECM 2.0 
control.

Figure 3

ECM 
2.3/2.5

Power Connector
(5-pin)

Control Connector
(16-pin)

Hex-head Screws

Motor Connector
(3-pin)

Motor Connector
(3-pin)

Control Disassembly

Drip Loop

Push until

Latch Seats
Over Ramp

From Motor

Circuit

Board

Replacing ECM Control Module

To replace the control module for the GE variable-speed indoor blower motor
you need to take the following steps:

1. You MUST have the correct replacement module.  The controls are

factory programmed for specific operating modes.  Even though they look
alike, different modules may have completely different functionality.

USING THE WRONG CONTROL MODULE VOIDS ALL PRODUCT
WARRANTIES AND MAY PRODUCE UNEXPECTED RESULTS.

2. Begin by removing AC power from the furnace or air handler being

serviced.  

DO NOT WORK ON THE MOTOR WITH AC POWER

APPLIED.  

To avoid electric shock from the motor’s capacitors, disconnect

power and wait at least 5 minutes before opening motor.

3. It is usually not necessary to remove the motor from the blower

assembly.  However, it is recommended that the whole blower assembly,
with the motor, be removed from the furnace/air handler.  (Follow the
manufacturer’s procedures).  Unplug the two cable connectors to the motor.
There are latches on each connector.  

DO NOT PULL ON THE WIRES.

The plugs remove easily when properly released.

4. Locate the two standard ¼" hex head bolts at the rear of the control

housing (at the back end of the control opposite the shaft end).  

Refer to

Figure 14.  

Remove these two bolts from the motor and control

assembly while holding the motor in a way that will prevent the motor
or control from falling when the bolts are removed.  If an ECM2.0
control is being replaced (recognized by an aluminum casting rather
that a deep-drawn black steel can housing the electronics), remove only
the hex-head bolts.  

DO NOT REMOVE THE TORX-HEAD

SCREWS.

5. The control module is now free of mechanical attachment to the

motor endshield but is still connected by a plug and three wires inside
the control.  Carefully rotate the control to gain access to the plug at the
control end of the wires.  With thumb and forefinger, reach the latch
holding the plug to the control and release it by squeezing the latch tab
and the opposite side of the connector plug and gently pulling the plug
out of the connector socket in the control.  

DO NOT PULL ON THE

WIRES.  GRIP THE PLUG ONLY.

6. The control module is now completely detached from the motor.

Verify with a standard ohmmeter that the resistance from each motor
lead (in the motor plug just removed) to the motor shell is >100K ohms.

Refer to Figure 15.  

(Measure to unpainted motor end plate.)  If any

motor lead fails this test, do not proceed to install the control module.

THE MOTOR IS DEFECTIVE AND MUST BE REPLACED.

Installing the new control module will cause it to fail also.

7. Verify that the replacement control is correct for your application.

Refer to the manufacturer's authorized replacement list.  

USING THE

WRONG CONTROL WILL RESULT IN IMPROPER OR NO
BLOWER OPERATION.

  Orient the control module so that the 3-

wire motor plug can be inserted into the socket in the control.
Carefully insert the plug and press it into the socket until it latches.  

A

SLIGHT CLICK WILL BE HEARD WHEN PROPERLY
INSERTED.

  Finish installing the replacement control per one of the three

following paragraphs, 8a, 8b or 8c.

8a. 

IF REPLACING AN ECM 2.0 CONTROL

 (control in cast

aluminum can with air vents on the back of the can) 

WITH AN ECM

2.3 CONTROL

 (control containing black potting for water protection

in black deep-drawn steel case with no vents in the bottom of the can),
locate the two through-bolts and plastic tab that are packed with the
replacement control.  Insert the plastic tab into the slot at the perimeter
of the open end of the can so that the pin is located on the inside of the
perimeter of the can.  Rotate the can so that the tab inserts into the tab
locater hole in the endshield of the motor.  Using the two through-bolts
provided with the replacement control, reattach the can to the motor.

THE TWO THROUGH-BOLTS PROVIDED WITH THE
REPLACEMENT ECM 2.3 CONTROL ARE SHORTER THAN
THE BOLTS ORIGINALLY REMOVED FROM THE ECM 2.0
CONTROL AND MUST BE USED IF SECURE ATTACHMENT
OF THE CONTROL TO THE MOTOR IS TO BE ACHIEVED.

DO NOT OVERTIGHTEN THE BOLTS.

8b. 

IF REPLACING AN ECM 2.3 CONTROL

 

WITH AN ECM

2.3 CONTROL

, the plastic tab and shorter through-bolts are not needed.

The control can be oriented in two positions 180° apart.  

MAKE SURE

THE ORIENTATION YOU SELECT FOR REPLACING THE
CONTROL ASSURES THE CONTROL'S CABLE CONNECTORS
WILL BE LOCATED DOWNWARD IN THE APPLICATION SO
THAT WATER CANNOT RUN DOWN THE CABLES AND INTO
THE CONTROL.

  Simply orient the new control to the motor's

endshield, insert bolts, and tighten.  

DO NOT OVERTIGHTEN THE

BOLTS.

8c. 

IF REPLACING AN ECM 2.0 CONTROL WITH AN ECM 2.0

CONTROL 

(It is recommended that ECM 2.3 controls be used for all

replacements), 

the new control must be attached to the motor using

through bolts identical to those removed with the original control.  

DO

NOT OVERTIGHTEN THE BOLTS.

9. Reinstall the blower/motor assembly into the HVAC equipment.

Follow the manufacturer's suggested procedures.

10. Plug the 16-pin control plug into the motor.  The plug is keyed.

Make sure the connector is properly seated and latched.

11. Plug the 5-pin power connector into the motor.  Even though the

plug is keyed, 

OBSERVE THE PROPER ORIENTATION.  DO NOT

FORCE THE CONNECTOR.

  It plugs in very easily when properly

oriented.  

REVERSING THIS PLUG WILL CAUSE IMMEDIATE

FAILURE OF THE CONTROL MODULE.

12. Final installation check.  Make sure the motor is installed as follows:

a. Unit is as far INTO the blower housing as possible.
b.Belly bands are not on the control module or covering vent holes.
c. Motor connectors should be oriented between the 4 o’clock and 8

o’clock positions when the blower is positioned in its final
location and orientation.

d.Add a drip loop to the cables so that water cannot enter the motor

by draining down the cables.  

Refer to Figure 16.

The installation is now complete.  Reapply the AC power to the HVAC
equipment and verify that the new motor control module is working
properly.  Follow the manufacturer's procedures for disposition of the old
control module.

Figure 15

Figure 14

Figure 16

Содержание S26H1

Страница 1: ...S MODELS S26H1 S26H1D W26H1 S31H1 S31H1D W31H1 S38H1 S38H1D W38H1 S43H1 S43H1D W43H1 S49H1 S49H1D W49H1 S61H1 S61H1D W61H1 Manual 2100 527E Supersedes 2100 527D File Volume III Tab 17 Date 12 15 11 Ba...

Страница 2: ...Specifications S H 25 Table 7B Electrical Specifications W H 26 Table 8 Indoor Blower Performance 27 Tables 9A Indoor Blower Performance S H 27 Tables 9B Indoor Blower Performance W H 27 Getting Other...

Страница 3: ...Design for Residential ACCA Manual D Winter and Summer Air Conditioning and Equipment Selection FOR MORE INFORMATION CONTACT THESE PUBLISHERS ACCA Air Conditioning Contractors of America 1712 New Ham...

Страница 4: ...efore the installation is made See Page 3 for information on codes and standards Size of unit for a proposed installation should be based on heat loss gain calculation made according to methods of Air...

Страница 5: ...act distributor or factory for ordering information If using a return air filter grille filters must be of sufficient size to allow a maximum velocity of 400 fpm NOTE If no return air duct is used app...

Страница 6: ...tion and maintaining the required clearance to combustible material See Figure 3 for details on opening sizes 3 Locate and mark lag bolt locations and bottom mounting bracket location See Figures 3A 3...

Страница 7: ...a B f o s n o i s n e m i D L E D O M H T D I W W H T P E D D T H G I E H H Y L P P U S N R U T E R A B C B E F G I J K L M N O P Q R 1 S 2 S T 1 H 6 2 S 1 H 1 3 S 1 H 6 2 W 1 H 1 3 W 0 0 2 8 3 5 2 1...

Страница 8: ...R 1 4 CLEARANCE ON ALL RAIN FLASHING COMBUSTIBLE MATERIALS DUCT TOP FLASHING AT TIME OF INSTALLATION 1 4 MIN CLEARANCE FROM REQUIRED DIMENSIONS TO MAINTAIN OPENING ENTIRE LENGTH OF TOP MATERIALS NOTES...

Страница 9: ...3 4 32 12 5 1 2 TOP FOAM AIR SEAL HEATER ACCESS RETURN AIR 2 Wall Opening and Hole Location View Right Side View 29 OPENING SUPPLIED Supply Opening NOTES SUPPLY AIR IT IS RECOMMENDED THAT A BEAD OF R...

Страница 10: ...This is required for the first 3 feet of ducting It is important to insure that the 1 4 inch minimum spacing is maintained at all points Failure to do this could result in overheating the combustible...

Страница 11: ...IR FACTORY SUPPLIED RAIN FLASHING SUPPLY AIR MIS 548 A SIDE VIEW I A C K E 1 000 B 1 000 SUPPLY DUCT OVER FRAME INTERIOR FINISHED WALL ALL AROUND DUCT FRAMING MATERIAL EXTERIOR FINISH WALL OPENING FOR...

Страница 12: ...WALL OPENING W GRILLE SUPPLY DUCT MAYBE LOCATED IN AN ATTIC OR BELOW CEILING RAFTERS AS SHOWN CEILING RAIN RETURN AIR SLEEVE WALL SUPPLY AIR DUCT RAFTERS RAFTERS RETURN AIR OPENING W GRILLE RAIN FALSE...

Страница 13: ...ircuit breaker that is to be used with the equipment The correct size must be used for proper circuit protection and also to assure that there will be no nuisance tripping due to the momentary high st...

Страница 14: ...the correct set points NOTE The additional LAB low ambient bypass relay is required to prevent heater operation during low temperature cooling operation OPTIONAL COMPRESSOR CUTOFF THERMOSTAT See Figu...

Страница 15: ...mostat This is done to maximize FIGURE 11 ELECTRIC HEAT HOLD OFF WIRING 15 20KW 1 PH 3 PH FIGURE 10 ELECTRIC HEAT HOLD OFF WIRING 4 10KW 1 PH 6 9KW 3 PH efficiency by utilizing the heat pump to bring...

Страница 16: ...iple leaks and recharges R 410A refrigerant is close to being an azeotropic blend it behaves like a pure compound or single component refrigerant The remaining refrigerant charge in the system may be...

Страница 17: ...l minutes the compressor s internal protector will trip All three phase ZP compressors are wired identically internally As a result once the correct phasing is determined for a specific system or inst...

Страница 18: ...e system to heating operation automatically after 10 minutes The heat pump defrost control board HPC has an option of 30 60 or 90 minute setting All models are shipped from the factory on the 60 minut...

Страница 19: ...29 120 SW 1 SW 2 TIME SEC OFF OFF ON ON OFF ON OFF ON 30 60 180 MIS 2668 A OFF LOW PRESSURE BYPASS TIMER SWITCH FACTORY SETTING 120 SECONDS ACCUMULATED DEFROST TIME TIMER FACTORY SETTING 60 MIN ON FIG...

Страница 20: ...i r o s s e r p m o c Y o N 1 1 y l l a n i f d n a r o t i n o M e s a h P n o n o i t c e s e e s t i n u f o e s a h p t c e r r o c n i g n i r i w t a t s o m r e h t k c e h C g n i r i w t i n...

Страница 21: ...6 4 0 7 4 0 8 4 0 9 4 0 0 5 5 8 9 6 5 4 8 2 5 5 0 4 6 3 5 1 5 0 2 5 4 1 5 0 5 8 2 0 9 4 0 9 5 7 4 0 0 2 6 4 5 5 8 4 4 4 5 5 3 4 5 9 2 2 4 7 7 0 1 4 8 9 8 9 3 7 5 7 8 3 2 5 6 7 3 3 8 5 6 3 8 4 5 5 3 5...

Страница 22: ...ure tables show nominal pressures for the units Since many installation specific situations can affect the pressure readings this information should only be used by certified technicians as a guide fo...

Страница 23: ...1 7 3 3 9 3 1 2 5 3 1 4 1 0 7 3 3 4 1 1 9 3 4 4 1 3 1 4 8 4 1 0 4 4 0 5 1 9 6 4 3 5 1 1 0 5 5 5 1 5 3 5 8 5 1 2 7 5 B D g e d 5 8 B W g e d 2 7 e d i S w o L e d i S h g i H 2 4 1 9 4 3 4 4 1 4 6 3 6...

Страница 24: ...8 B W g e d 7 6 e d i S w o L e d i S h g i H 0 4 1 3 3 3 0 4 1 2 5 3 1 4 1 2 7 3 3 4 1 4 9 3 3 4 1 8 1 4 7 4 1 3 4 4 9 4 1 0 7 4 2 5 1 9 9 4 5 5 1 9 2 5 8 5 1 1 6 5 B D g e d 5 8 B W g e d 2 7 e d i...

Страница 25: ...6 8 0 A 1 8 4 0 5 8 0 1 Z 0 B 0 0 B 1 H 1 3 S 3 0 6 8 0 2 0 3 2 1 9 1 5 2 0 1 0 1 6 0 B 1 7 3 0 4 8 0 1 Z 0 C 0 0 C 1 H 1 3 S 3 0 6 0 6 4 1 0 1 5 1 4 1 4 1 6 0 C 1 9 1 0 2 2 1 2 1 Z 0 A 0 0 A 1 H 8 3...

Страница 26: ...1 7 4 0 5 8 0 1 Z 0 B 0 0 B 1 H 1 3 W 3 0 6 8 0 2 0 3 2 1 9 1 5 2 0 1 0 1 6 0 B 1 7 3 0 4 8 0 1 Z 0 C 0 0 C 1 H 1 3 W 3 0 6 0 6 4 1 9 5 1 4 1 4 1 6 0 C 1 8 1 0 2 2 1 2 1 Z 0 A 0 0 A 1 H 8 3 W 1 0 6 8...

Страница 27: ...d e e p S h g i H l i o C t e W y r D d e e p S w o L l i o C t e W y r D 0 0 0 0 1 0 5 0 1 0 0 9 0 5 9 1 0 5 8 0 0 9 0 0 8 0 4 8 2 0 0 7 0 5 7 0 5 6 0 0 7 l e d o M P S E d e t a R 1 P S E x a M 2 y...

Страница 28: ...it s air noise cabinet duct or motor noise interview customer if necessary Air noise High static creating high blower speed Is airflow set properly Does removing filter cause blower to slow down Check...

Страница 29: ...Refer to the manufacturer s authorized replacement list USING THE WRONG CONTROL WILL RESULT IN IMPROPER OR NO BLOWER OPERATION Orient the control module so that the 3 wire motor plug can be inserted...

Отзывы: