Manual 2100-344
Page

5

INSTALLATION

LOCATION

GENERAL

The unit must be located outside, or in a well ventilated
area.  It must not be in the space being heated or cooled.  A
sound absorbing material should be considered if the unit is
to be installed in such a position or location that might cause
transmission of sound or vibration to the living area or
adjacent buildings.

SLAB MOUNTING

In areas where winter temperatures DO NOT go below
32° F for periods over twelve hours, the unit may be slab
mounted at grade level.  When installing unit at grade level,
install on a concrete slab at least four inches above finished
grade level.  Slab should have a slope tolerance away from
the building structure of at lease 1/4 inch per foot, while
being level from side to side.  This will prevent ice buildup
under the unit during defrost cycles.  Place slab in a location
where runoff water from higher ground will not collect
around unit.  See Figure 3.

A minimum of 18 inches should be provided between the
coil inlet and any building surfaces.  Provide at least four
feet between coil outlet and any building wall, fences or
other vertical structures.  Provide a minimum of three feet
clearance on the service access side of the unit.  See
Figure 4

ROOF MOUNTING

When a unit is installed in areas where low ambient
temperatures or strong winter winds exist, it should be
placed so prevailing winter winds are not in direct line with
the heat pump coil.  If this is not possible, a wind barrier
should be constructed.  Place barrier 24 inches from the coil
inlet side of the unit and in the direction of prevailing winds.
Size barrier at least the same height and width as the unit.
This may be necessary on ground level installations, also.
See Figure 5.

WINTER INSTALLATION BELOW 32°F

In areas where winter conditions go below 32°F for
extended periods, the unit must be elevated above the
mounting surface to prevent snowfall or defrost ice
accumulation from interfering with the operation of the unit.
A minimum of twelve inch elevation is recommended, while
greater elevation may be required for areas of high snow
accumulation.  Poured concrete, steel framework, brick,
cement block, etc., can be utilized to construct a suitable
raised mounting platform.  See Figure 6.

DUCT WORK

Refer to Tables 4, 5 and 5A when designing duct work for
maximum static pressure available with the specific model
and heater package being installed.  Unit duct work is
suitable for 0” clearance to combustible materials.

necessary to dispose of the condensate from the outdoor
coil on the heating cycle, and this is virtually impossible
with the unit installed inside the crawl space.

3.

SLAB MOUNTED AT GROUND LEVEL

    This

type installation is ideal for homes with a slab floor
construction where a roof mounted unit is not desired.
The supply and return duct work can be run through a
furred closet space.

4.

THROUGH THE WALL 

 –  This type installation

requires a suitable framework to be fabricated capable of
withstanding the unit weight.  Normally the unit will be
insulated so as to minimize supply and return duct work.

5.

OTHER INSTALLATIONS

  – Many other

installations are possible with the packaged heat pump.
No matter what the installation, always consider the
following facts:

A. Insure that the discharge air is not obstructed in any

way so as to cause operation difficulties.

B. The indoor coil drain pan is equipped with a

coupling that must be piped through a condensate
drain trap to a suitable drain.

C. Always mount the unit is such a position that it may

be easily reached for servicing and maintenance.

D. Insure that the unit is clear so that proper air flow

over the outdoor coil will be maintained.

If this unit is operated in cooling below a 65° outdoor
ambient temperature, the installation of low ambient
controls (CMA-6) to unit is required.

TYPICAL INSTALLATIONS

1.

ROOF MOUNTED

  –  The unit is mounted on a

sturdy base on the roof of the building.  Return air to the
unit is brought through a single return grille (grilles with
built-in filters are best since they enable easy access for
filter changing).  Return air ducts are attached to the
lower section of the front panel.  Supply air is brought
from the unit to attic duct work or to a furred down hall.
Supply air duct is attached to the top of the front panel.

CAUTION:  All outdoor duct work must be thoroughly

insulated and weatherproofed.  All attic duct work
must be thoroughly insulated.  Two inch thick
insulation with suitable vapor barrier is
recommended for both outdoor and attic runs.

In roof top installation, as in all installations, the heat
pump must be level from side to side.  However, the unit
should have a pitch along the length to assure complete
external drainage of precipitation and of defrost
condensate.

2.

CRAWL SPACE

  –  Duct work installed in crawl

space must be well insulated and provided with a vapor
barrier.  In addition, the crawl space must be thoroughly
ventilated and provided with a good vapor barrier as a
ground cover.  It is most desirable to install the unit
outdoors rather than inside the crawl space, so that it
will be readily accessible for service.  In addition, it is

Содержание PH1224

Страница 1: ...STRUCTIONS SINGLE PACKAGE HEAT PUMPS MODELS PH1224 PH1230 PH1236 Manual 2100 344 File Volume II Tab 11 Date 08 21 98 Bard Manufacturing Company Bryan Ohio 43506 Since 1914 Moving ahead just as planned...

Страница 2: ...Discharge Tube Brazing 17 Pressure Tables 18 Wiring Diagrams 19 21 Figures Figure 1 Prefabricated Rood Curb Specifications 4 Figure 2 Field Fabricated Curbing 4 Figure 3 Elevated Mounting Platforms 6...

Страница 3: ...d Summer Air Conditioning and Equipment Selection Commercial Low Pressure ACCA Manual Q Low Velocity Duct System Design Load Calculation For Commercial ACCA Manual N Summer and Winter Air Conditioning...

Страница 4: ...0 4 2 5 0 1 5 1 0 0 1 7 1 0 0 1 4 3 0 0 2 1 5 5 7 3 0 5 7 5 2 1 1 0 0 8 2 1 0 0 0 6 2 0 0 4 8 3 8 0 2 7 1 4 5 2 6 0 6 0 3 1 1 1 6 2 3 5 9 7 0 3 0 6 0 8 0 1 6 4 0 1 0 1 8 9 0 B B P 3 H E 5 1 B B P 3 H...

Страница 5: ...uct work Flanges are provided for attaching the supply and return ducts These instructions explain the recommended method to install the air cooled self contained unit and the electrical wiring connec...

Страница 6: ...ation Return Air Dimension C is length Supply Air Dimension C is length Return Air Dimension H is width Supply Sir Dimension J is width f o o R b r u C A B C D E F J H d o o H f o o R l e d o M g n i...

Страница 7: ...mbustible materials necessary to dispose of the condensate from the outdoor coil on the heating cycle and this is virtually impossible with the unit installed inside the crawl space 3 SLAB MOUNTED AT...

Страница 8: ...Manual 2100 344 Page 6 FIGURE 3 ELEVATED MOUNTING PLATFORMS MIS 1183 MIS 1185 FIGURE 4 AIRFLOW and SERVICE ACCESS CLEARANCES...

Страница 9: ...Manual 2100 344 Page 7 FIGURE 5 ROOF TOP APPLICATION May also be required for ground level installations MIS 1176 FIGURE 6 SLAB MOUNTING AT GROUND LEVEL Above 32 F Outside Temperature MIS 1184...

Страница 10: ...larger Do not operate unit without trap Unit must be level or slightly inclined toward drain With a trap installed on a unit located in an unconditioned area water in the trap may freeze It is recomme...

Страница 11: ...e for connection with copper wire only These instructions must be adhered to Refer to the National Electrical Code for complete current carrying capacity data on the various insulation grades of wirin...

Страница 12: ...a c i d n I y a l p s i D k c e h C s p m a L g n i t a c i d n I 4 3 0 3 0 4 8 0 8 4 9 F 1 f o t r a P t a t s o m r e h T p u k c a b y r e t t a B y a d 7 e l b a m m a r g o r p l a t i g i D t a...

Страница 13: ...ing of the heating equipment to the structure Utilization of the Heating Application Data and the heat loss calculation of the building are useful in determining the correct set points TRANSFORMER TAP...

Страница 14: ...etergent THREE PHASE SCROLL COMPRESSOR START UP INFORMATION Scroll compressors like several other types of compressors will only compress in one rotational direction Direction of rotation is not an is...

Страница 15: ...Manual 2100 344 Page 13 FIGURE 11 HEAT PUMP CONTROL BOARD MIS 1191...

Страница 16: ...2 5 0 5 2 6 1 6 0 6 8 5 4 5 2 5 SERVICE AND TROUBLESHOOTING SERVICE HINTS 1 Caution homeowner to maintain clean air filters at all times Also not to needlessly close off supply and return air register...

Страница 17: ...v i t c e f e d r o t i c a p a c r o t o M g n i t a r r o t i c a p a c k c e h C d e t r o h s r o n e p o r o f k c e h C r o t i c a p a c r o t i c a p a c e c a l p e R l o r t n o c p m u p t...

Страница 18: ...1 2 8 9 4 0 2 1 9 1 2 6 2 1 0 8 2 3 8 5 6 3 0 8 6 2 9 4 2 1 0 8 0 1 3 7 8 4 0 1 1 9 8 0 2 2 1 0 9 2 8 4 5 5 3 0 9 6 3 8 1 2 1 0 9 0 1 7 6 7 4 0 0 1 8 0 1 8 1 1 0 0 3 5 4 5 4 3 0 0 7 3 8 8 1 1 0 0 1 1...

Страница 19: ...owly and uniformly until braze material softens and the tube can be pulled out of suction fitting See Figure 10 To connect Recommended brazing materials silfos with minimum 5 silver or silver braze ma...

Страница 20: ...2 9 7 4 9 2 0 8 4 1 3 1 8 3 3 3 2 8 5 5 3 B D g e d 0 8 B W g e d 7 6 e d i S w o L e d i S h g i H 7 7 6 1 2 9 7 1 3 2 0 8 8 4 2 2 8 5 6 2 3 8 3 8 2 4 8 2 0 3 6 8 2 2 3 7 8 2 4 3 8 8 4 6 3 B D g e d...

Страница 21: ...Manual 2100 344 Page 19 Wiring Diagram 4098 123 printed from CAD to get size needed...

Страница 22: ...Manual 2100 344 Page 20 Wiring Diagram 4098 124 printed from CAD to get size needed...

Страница 23: ...Manual 2100 344 Page 21 Wiring Diagram 4098 211 printed from CAD to get size needed...

Отзывы: