Manual 2100-578B
Page
13 of 41
INSTALLATION
9'-5"
MINIMUM
REQUIRED
HEIGHT
9'-10" MINIMUM
CLEARANCE
RECOMMENDED TO
BOTTOM OF ROOF
OR FIXED CEILING
3" RISER
FIELD SUPPLIED DUCT
MIS-3199
TURNING VANES
RECOMMENDED
MINIMUM
12"
4" MINIMUM FROM
TOP OF UNIT TO
DUCT BOTTOM
BOTTOM OF ROOF
FLOOR
OR FIXED CEILING
SUSPENDED
CEILING
20"
MINIMUM
7'-9 3/4"
UNIT HEIGHT
9'-7" MINIMUM
CLEARANCE
RECOMMENDED TO
BOTTOM OF ROOF
OR FIXED CEILING
9'-2"
MINIMUM
REQUIRED
INSTALLATION
HEIGHT
BOTTOM OF ROOF
FLOOR
OR FIXED CEILING
SUSPENDED
CEILING
20"
MINIMUM
7'-9 3/4"
UNIT HEIGHT
FIELD SUPPLIED DUCT
MIS-3198
TURNING VANES
RECOMMENDED
MINIMUM
12"
4" MINIMUM FROM
TOP OF UNIT TO
DUCT BOTTOM
FIGURE 5B
3" RISER APPLICATION
FIGURE 5A
DUCTED APPLICATION – BASIC UNIT