Bard CompleteStat CS9B-THO Скачать руководство пользователя страница 1

Page 

1 of 24

CONTROLLER INSTALLATION, 

OPERATION & QUICK START GUIDE

INSTALLATION INSTRUCTIONS

Bard Manufacturing Company, Inc. 
Bryan, Ohio 43506
www.bardhvac.com

Manual: 2100-566F
Supersedes: 2100-566E 
Date: 9-1-16

Bard CompleteStat

TM

Models:

CS9B-THO
CS9B-THOC

CS9BE-THO
CS9BE-THOC

Содержание CompleteStat CS9B-THO

Страница 1: ...OPERATION QUICK START GUIDE INSTALLATION INSTRUCTIONS Bard Manufacturing Company Inc Bryan Ohio 43506 www bardhvac com Manual 2100 566F Supersedes 2100 566E Date 9 1 16 Bard CompleteStatTM Models CS9...

Страница 2: ...ge with Honeywell W7459A Control Economizer with or without dehumidification 17 WD9 Heat Pump 1 Stage with Honeywell W7220 JADETM Control Economizer with or without dehumidification 18 WD10 Heat Pump...

Страница 3: ...al from control to unit 2 Turn the hex screws in the bottom and top of the controller clockwise inward until they clear the cover Remove base plate from controller INSTALLATION 3 Route completed wirin...

Страница 4: ...l Setback 15 Heat Setback 16 Standby Time Minutes 17 Motion Sensing Daily Schedule 18 Date 19 Time 20 Occupied Minimum Cooling 21 Occupied Maximum Cooling 22 Unoccupied Minimum Cooling 23 Unoccupied M...

Страница 5: ...ll to ADVANCED Press ENTER button 3 In the ADVANCED menu screen press ENTER button to enter the APPLICATION menu 4 Controller will ask for Admin Level Password Enter BARD or 1914 Press ENTER button 5...

Страница 6: ...to choose DEHUMIDIFICATION 11 Press ENTER button again to highlight current dehum choice default is DISABLE 12 Press UP or DOWN button to toggle ENABLE DISABLE Press ENTER button to select save choice...

Страница 7: ...Press ENTER button 4 Press DOWN button to scroll to DAMPER Press ENTER button 5 Press UP or DOWN button to choose from the available economizer options NONE No economizer or standard vent package ERV...

Страница 8: ...mode only OFF HVAC system is inactive 4 Press ENTER button to save choice 5 Press LEFT button two 2 times to return to home screen Setpoints To access setpoints from the home screen 1 Press RIGHT but...

Страница 9: ...Y1 1st Stage Compressor Output 24VAC SPST Relay Y0 Economizer Output 24VAC SPST Relay SC 24VAC to Relay Outputs Y0 O B G Power O B Reversing Valve Output 24VAC SPST Relay G Indoor Blower Output 24VAC...

Страница 10: ...s an existing call for the indoor blower whether through space conditioning or through constant fan operation Conventional 1H 1C 2H 1C 1H 2C or 2H 2C with Economizer Operation G Y O Y1 Y2 W1 E W2 O B...

Страница 11: ...e System Selection on page 5 3 Electric heat must be configured for a heat pump application see Auxiliary Heat Electric Heat Setup on page 7 Single Stage Heat Pump without Economizer Operation G Y O Y...

Страница 12: ...a heat pump application see Auxiliary Heat Electric Heat Setup on page 7 Two Stage Heat Pump with Economizer Operation G Y O Y1 Y2 W1 E W2 O B D A Fan Only X 1st Stage Cooling X X X 2nd Stage Cooling...

Страница 13: ...DIS 2 Stage HP with or w o Elec Heat EIFM Factory E Economizer w W7459A Control On Off 11 HP THO THOC HP 2 Stage EN DIS 2 Stage HP with or w o Elec Heat ECONWM Factory T or W Economizer w JADE W7220...

Страница 14: ...2100 566F Page 14 of 24 IMPORTANT Be sure to connect these field installed jumpers for proper operation IMPORTANT Be sure to connect these field installed jumpers for proper operation EIFM WIRING DIA...

Страница 15: ...anual 2100 566F Page 15 of 24 IMPORTANT Be sure to connect these field installed jumpers for proper operation IMPORTANT Be sure to connect these field installed jumpers for proper operation EIFM JADET...

Страница 16: ...00 566F Page 16 of 24 IMPORTANT Be sure to connect these field installed jumpers for proper operation IMPORTANT Be sure to connect these field installed jumpers for proper operation JADETM WIRING DIAG...

Страница 17: ...Manual 2100 566F Page 17 of 24 IMPORTANT Be sure to connect these field installed jumpers for proper operation IMPORTANT Be sure to connect these field installed jumpers for proper operation EIFM...

Страница 18: ...566F Page 18 of 24 IMPORTANT Be sure to connect these field installed jumpers for proper operation IMPORTANT Be sure to connect these field installed jumpers for proper operation EIFM JADETM WIRING DI...

Страница 19: ...Manual 2100 566F Page 19 of 24 IMPORTANT Be sure to connect these field installed jumpers for proper operation IMPORTANT Be sure to connect these field installed jumpers for proper operation JADETM...

Страница 20: ...100 566F Page 20 of 24 IMPORTANT Be sure to connect these field installed jumpers for proper operation IMPORTANT Be sure to connect these field installed jumpers for proper operation EIFM WIRING DIAGR...

Страница 21: ...Manual 2100 566F Page 21 of 24 IMPORTANT Be sure to connect these field installed jumpers for proper operation IMPORTANT Be sure to connect these field installed jumpers for proper operation EIFM...

Страница 22: ...2100 566F Page 22 of 24 IMPORTANT Be sure to connect these field installed jumpers for proper operation IMPORTANT Be sure to connect these field installed jumpers for proper operation WIRING DIAGRAMS...

Страница 23: ...Manual 2100 566F Page 23 of 24 IMPORTANT Be sure to connect these field installed jumpers for proper operation IMPORTANT Be sure to connect these field installed jumpers for proper operation...

Страница 24: ...ystem PINK PURPLE 1 W3 01 W2 E Y1 G C R Y E F W1 B L HONEYWELL W7220 BLK RED WHT BLU YEL ORG USE ENCLOSED RELAY D SC A W2 W1 E SC Y2 Y1 YO O B G IN9 ROS GND REM OAT LAS SC A B GND L COM 24V CompleteSt...

Отзывы: