
R5906150 /02
XDL
109
10.3 Projector ON/OFF cycle explained
Projector ON/OFF cycle
t
T
OFF
ON
LS
1
B
C
D
2
4
3
5
6
7
4
8
A
Image 10-4
LS
Laser Status light.
T
Temperature inside sealed compartments.
t
time.
A..
D
Operator manipulations.
1..8
Different process stages.
Stage description
Stage 1 :
Projector is
switched off
. Input & Communication Unit is not active and the laser status light (LS) is
off.
Stage 2 :
Projector is projector is
booting
. This process starts as soon as the power switch is switched on
(reference A, Image 10-4). This process takes several seconds and during this process the Power On/Off
button is blinking white. The laser status light remains off.
Stage 3 : Initialization
. This process starts as soon as the projector has finished booting up. The initialization
of all electronic boards takes approximately two minutes and during this process the backlight of the Power
On/Off button is blinking blue. The laser status light remains off.
Stage 4 :
Projector is
READY
. All electronic boards are up and running. On the local keypad the OK button,
Shutter button and the Menu Activation button become active. The backlight of the Power on/off button is
white. The laser status light remains off.
Stage 5 :
The projector is in
CONDITIONING
mode. This process starts as soon as the On/Off button is
pressed when the projector is in READY mode (reference B, Image 10-4). The shutter automatically closes in
this stage for laser safety reasons. The laser status light remains off.
The first stage of the CONDITIONING process is the environmental checks. In this stage, the projector verifies
if it is safe to turn on the pump of the cooling circuit and to extract humidity from the sealed compartments
without having the risk of condensation. The temperature inside the sealed compartments is kept on ambient
level.
Once the projector has confirmed it is safe to start conditioning, the conditioning process itself will start. This is
indicated by the
laser status light
(LS) on the top of the projector. This light will flash a few times and will then
light up continuously white. The sealed compartments are cooling down from ambient to operating
temperature and humidity is extracted. The conditioning process takes approximately 3 to 20 minutes (exact
time depends on the environmental conditions).
Following substages take place during CONDITIONING:
Stage 6.1 :
Checking ambient and internal conditions.
Stage 6.2 :
Turning pump on. Reaching liquid flow target.
Stage 6.3 :
Flow target reached. Conditioning humidity in the projector.
Stage 6.4 :
Cooling started.
Stage 6.5 :
Reaching liquid temperature target.
Содержание XDL Series
Страница 1: ...ENABLING BRIGHT OUTCOMES Installation Manual XDL ...
Страница 2: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com en support www barco com ...
Страница 8: ...R5906150 02 XDL 8 ...
Страница 22: ...R5906150 02 XDL 22 Safety ...
Страница 30: ...R5906150 02 XDL 30 System overview ...
Страница 50: ...R5906150 02 XDL 50 Pulse Remote Control Unit ...
Страница 64: ...R5906150 02 XDL 64 Physical Installation ...
Страница 72: ...R5906150 02 XDL 72 Lenses Lens selection ...
Страница 80: ...R5906150 02 XDL 80 Scheimpflug ...
Страница 94: ...R5906150 02 XDL 94 Input Communication ...
Страница 104: ...R5906150 02 XDL 104 WiFi GSM Module ...
Страница 116: ...R5906150 02 XDL 116 Getting Started ...
Страница 134: ...R5906150 02 XDL 134 Specifications ...
Страница 138: ...R5906150 02 XDL 138 Environmental information ...
Страница 139: ...139 R5906150 02 XDL Overview video timings for video interfaces C ...
Страница 148: ...R5906150 02 XDL 148 Overview video timings for video interfaces ...
Страница 155: ...R5906150 02 XDL 155 ...
Страница 156: ...Barco NV President Kennedypark 35 8500 Kortrijk Belgium www barco com R5906150 02 2018 11 07 ...