Pressure check of cooling liquid circuit
•
•
C.1 Pressure check of cooling liquid circuit
When should it be done ?
The pressure of the cooling circuit should be checked on regular times. At least when replacing the lamp.
How to check
1. Unplug the projector from the wall outlet.
2. On the input side of the projector, remove the side by turning the 3 quarter turn fastener studs a quarter turn counter clockwise.
3. Pull the top side of the cover out of its spring locks.
4. Check the manometer. The manometer is situate on the top right of the lamp house compartment. (image C-2)
The pressure should be ± 1 bar (with projector in OFF state). When lower than 0.5 bar, a corrective action should be taken by
quali
fi
ed service personnel.
Any signi
fi
cant drops in pressure indicates leakage of liquid in the cooling circuit.
5. Hook on the side cover and close the 3 quarter turn fastener studs a quarter turn clockwise.
Image C-1
Removing the side cover
R5976690 XLM H25 25/05/2009
123
Содержание R9010100
Страница 1: ...XLM H25 Owner s manual R9010100 R5976690 06 25 05 2009 ...
Страница 8: ...Table of contents 4 R5976690 XLM H25 25 05 2009 ...
Страница 26: ...2 Installation Guidelines 22 R5976690 XLM H25 25 05 2009 ...
Страница 40: ...3 Connections 36 R5976690 XLM H25 25 05 2009 ...
Страница 50: ...4 Getting Started 46 R5976690 XLM H25 25 05 2009 ...
Страница 106: ...7 Installation 102 R5976690 XLM H25 25 05 2009 ...
Страница 126: ...B Standard Source Set up files 122 R5976690 XLM H25 25 05 2009 ...
Страница 136: ...Index 132 R5976690 XLM H25 25 05 2009 ...