C. Maintenance
C. MAINTENANCE
Overview
•
Pressure check of cooling liquid circuit
•
•
C.1 Pressure check of cooling liquid circuit
When should it be done ?
The pressure of the cooling circuit should be checked on regular times. At least when replacing the lamp.
How to check
1. Unplug the projector from the wall outlet.
2. On the input side of the projector, remove the side by turning the 3 quarter turn fastener studs a quarter turn counter clockwise.
3. Pull the top side of the cover out of its spring locks.
4. Check the manometer. The manometer is situate on the top right of the lamp house compartment. (image C-2)
The pressure should be ± 1 bar (with projector in OFF state). When lower than 0.5 bar, a corrective action should be taken by
qualified service personnel.
Any significant drops in pressure indicates leakage of liquid in the cooling circuit.
5. Hook on the side cover and close the 3 quarter turn fastener studs a quarter turn clockwise.
Image C-1
Removing the side cover
R59770014 XLM HD30 07/07/2006
119
Содержание R9004460
Страница 1: ...XLM HD30 Owner s manual R9004460 R9004461 R59770014 00 07 07 2006...
Страница 4: ......
Страница 8: ...Table of contents 4 R59770014 XLM HD30 07 07 2006...
Страница 26: ...2 Installation Guidelines 22 R59770014 XLM HD30 07 07 2006...
Страница 50: ...4 Getting Started 46 R59770014 XLM HD30 07 07 2006...
Страница 118: ...A Specifications 114 R59770014 XLM HD30 07 07 2006...
Страница 132: ...Index 128 R59770014 XLM HD30 07 07 2006...