6. Setup process of an ILite rental display
6.1 Set up a floor mounted ILite rental display
C
AUTION
:
Before setting up a floor mounted rental display, you have to determine the length of the foot
beams and the weight of the necessary ballast. Both parameters depend on the final height of the LED-display
and the position of the LED-display upon the foot beams. Consult the “Ballast calculator”, which is available
on the secured “Partner Zone” of Barco’s web site.
W
ARNING
:
The maximum height of a base stand ILite rental display is 12 tiles high.
Setup process
1. The first stage in the process is the assembling of a solid and level foot construction, which has to support the hole display. Such
a construction consist of foot beams, adjustable feet (optional), rental feet, rental foot alignment tools and, in case the display
will be higher than 6 tiles, stacker feet. Note that the stacker feet need to be installed simultaneous with the rental feet. Finally,
ballast has to be placed upon the foot beams to prevent the wall from possible tipping. The assembling of the foot construction
has to be done in following sequence:
a) Installation of the adjustable feet on the foot beams. Note that this is optional. See procedure "Install an adjustable foot",
page 38 for detailed installation instructions.
b) Installation of the rental feet upon the foot beams. See procedure "Install the ILite rental feet without stacker foot", page 39,
for a display with a maximum height of 6 tiles or see procedure "Install the ILite rental feet with stacker foot", page 41, in case
the display will be higher then 6 tiles.
c) Installation of the rental foot alignment tools. See procedure "Install the ILite rental foot alignment tool", page 43.
d) Alignment and leveling of the rental feet. See procedure "Align and level the ILite rental feet", page 46.
e) Attach the foot beams to the ground with fixings and/or place the necessary ballast upon the foot beams. Note that the ballast
has to be placed between the end and the last 30 cm of the foot beam.
Image 6-1
2. The second stage in the process is the installation of the first row of ILite rental tiles upon the rental feet. See detailed procedure
"Install the first row of ILite tiles upon ILite rental feet", page 49.
Image 6-2
3. The following stage in the process is the installation of the next three rows of ILite rental tiles. See detailed procedure "Install a
row of ILite rental tiles into a base stand configuration", page 52.
4. The next stage is the installation of stacker profiles in case the ILite display will be higher than 6 tiles. Otherwise, you can skip
this stage.
32
R5976189 ILITE RENTAL DISPLAY 16/09/2005
Содержание ILite
Страница 1: ...ILite rental display Installation manual R5976189 04 16 09 2005...
Страница 4: ......
Страница 12: ...1 Safety 8 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Страница 16: ...2 Installation requirements 12 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Страница 34: ...5 ILite rental peripherals and accessories 30 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Страница 40: ...6 Setup process of an ILite rental display 36 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Страница 70: ...7 Basic setup procedures 66 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Страница 76: ...8 Cabling of an ILite display 72 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Страница 90: ...10 Servicing 86 R5976189 ILITE RENTAL DISPLAY 16 09 2005...
Страница 106: ...B Specifications 102 R5976189 ILITE RENTAL DISPLAY 16 09 2005...