2. Packaging
PULL
TO OPE
Image 2-2
2. Remove the assembly from the pallet
3. Remove the cardboard cover
4. Remove the large cardboard
5. Remove the 8 foam parts
6. Loosen and remove the 3 screws spacers fixing the projector to the wooden board
7. Remove the projector from the board
Save the original shipping carton and packing material, they will be necessary if you ever have to ship your
projector. For maximum protection, repack your projector as it was originally packed at the factory.
R5976821 BARCO ICON 15/03/2007
9
Содержание iCon H600
Страница 1: ...Barco iCon Owner s Manual H600 R9011114 R5976821 06 15 03 2007...
Страница 6: ......
Страница 10: ...Table of contents 4 R5976821 BARCO ICON 15 03 2007...
Страница 16: ...2 Packaging 10 R5976821 BARCO ICON 15 03 2007...
Страница 76: ...6 Getting started 70 R5976821 BARCO ICON 15 03 2007...
Страница 122: ...8 Advanced 116 R5976821 BARCO ICON 15 03 2007...
Страница 144: ...9 Network centric operations 138 R5976821 BARCO ICON 15 03 2007...
Страница 160: ...D SNMP services 154 R5976821 BARCO ICON 15 03 2007...
Страница 162: ...E Maintenance 156 R5976821 BARCO ICON 15 03 2007...
Страница 169: ...Index tint 85 troubleshoot 139 OSD 139 U Unpacking 7 R5976821 BARCO ICON 15 03 2007 163...
Страница 170: ...Index 164 R5976821 BARCO ICON 15 03 2007...