english
37
www.projectiondesign.com
6.4 Multi-channel 3D synchronization
X-PORT DCC120 has advanced capabilities for handling synchronization of multiple projec-
tors in a 3D installation.
6.4.1 Synchronous frame sequential
A typical synchronous frame sequential 3D setup is shown in Figure 6-2.
Figure 6-2. Synchronous frame sequential 3D
In this case IGs are synchronized and 3D sync from the source is connected from the DIN
connector on the IG to the BNC sync-in connector. The source 3D sync is then sent to every
projector in the setup. See table below.
SETTING
PROJECTOR 1
PROJECTOR 2
3D
Frame sequential
Frame sequential
3D L/R sync
BNC sync-in
BNC sync-in
3D BNC sync-out signal
Pass through
Pass through
6.4.2 Asynchronous frame sequential
This mode is not supported.
Содержание F35
Страница 2: ...F35 FL35 user s guide UF35 FL35 user s guide Introduction english 2 ...
Страница 8: ...User s Guide Introduction F35 FL35 user s guide Introduction english 8 ...
Страница 14: ...english 14 User s Guide What s in the Box F35 FL35 user s guide What s in the Box ...
Страница 20: ...english 20 User s Guide Getting to know the projector F35 FL35 user s guide Getting to know the projector ...
Страница 42: ...english 42 User s Guide Advanced setup F35 FL35 user s guide Advanced setup ...
Страница 52: ...english 52 User s Guide Technical specifications F35 FL35 user s guide Technical specifications ...
Страница 53: ......