6. GUI orientation
6.7
Con
fi
guration Menu
General
The
Con
fi
guration menu
is the module used to edit the Presentation Systems (creation, modi
fi
cation, deletion). This page is the
fi
rst page that appears when you launch the EM GUI software.
The user will use this page to add or remove devices to the selected system. The user also could modify the parameters of these
devices like inputs, backgrounds, outputs and destinations.
Description
The System con
fi
guration Menu is divided in 4 parts:
Image 6-6
System Con
fi
guration Menu
1
Device area
Available devices are listed in this area. There are 3 tabs
in this section:
•
Devices in use in the selected system.
•
Discovered devices on the local network.
•
Simulated devices.
2
System diagram area
The selected system is graphically represented in
this area. To view a different system you select the
corresponding tab from the top.
3
System modi
fi
er area
System information is displayed in this area. To view a
different system you select the corresponding tab from
the top
4
Adjustment area
There are several panels in this area: Input/Background,
Output and Destinations. Each panel displays the list
of items currently de
fi
ned in the system. The user can
also add or delete and de
fi
ne more items. The adjust tab,
allows the user to adjust variables in each panel.
The following sections describe each part of the System Con
fi
guration Menu in detail:
•
guration Menu > Device area", page 77
•
guration Menu > System diagram area", page 79
•
•
guration Menu > Adjustment area", page 82
76
R5905948 E2 12/12/2014
Содержание Event Master E2
Страница 1: ...E2 User s guide R5905948 00 12 12 2014...
Страница 8: ...Table of contents 4 R5905948 E2 12 12 2014...
Страница 16: ...2 Safety 12 R5905948 E2 12 12 2014...
Страница 32: ...3 General 28 R5905948 E2 12 12 2014...
Страница 82: ...6 GUI orientation Image 6 8 78 R5905948 E2 12 12 2014...
Страница 94: ...6 GUI orientation Image 6 20 90 R5905948 E2 12 12 2014...
Страница 115: ...6 GUI orientation Image 6 37 Thumbnail view Image 6 38 R5905948 E2 12 12 2014 111...
Страница 186: ...7 System Setup 182 R5905948 E2 12 12 2014...
Страница 192: ...8 Updating firmware 188 R5905948 E2 12 12 2014...
Страница 196: ...9 General operation example Image 9 3 192 R5905948 E2 12 12 2014...
Страница 213: ...9 General operation example Image 9 25 R5905948 E2 12 12 2014 209...
Страница 216: ...9 General operation example 212 R5905948 E2 12 12 2014...
Страница 220: ...10 Maintenance 10 2 Process Overview Flow chart Image 10 2 216 R5905948 E2 12 12 2014...
Страница 226: ...10 Maintenance Image 10 11 2 Pull out the Front cover and lay it flat in front of the unit 222 R5905948 E2 12 12 2014...
Страница 281: ...10 Maintenance Disregard the heatsink from the spare kit R5905948 E2 12 12 2014 277...
Страница 282: ...10 Maintenance 278 R5905948 E2 12 12 2014...
Страница 286: ...11 Environmental information Republic of Turkey In conformity with the WEEE Regulation 282 R5905948 E2 12 12 2014...
Страница 288: ...11 Environmental information 284 R5905948 E2 12 12 2014...
Страница 298: ...B Remote Control Protocol 294 R5905948 E2 12 12 2014...
Страница 299: ...C Troubleshooting C TROUBLESHOOTING R5905948 E2 12 12 2014 295...
Страница 300: ...C Troubleshooting 296 R5905948 E2 12 12 2014...