5. Physical installation top cooler
5. PHYSICAL INSTALLATION TOP COOLER
The tubes are pre-
fi
lled with liquid. It is not possible to re
fi
ll the coolers or tubes on site. Hence take care to
protect the tubes and quick connectors.
Overview
•
•
Mounting the housing on the frame
•
•
Mount cooling frame on the projector
•
•
•
5.1
Assembling the housing
Housing parts
The housing parts are delivered as a
fl
at pack and should be mounted together at the customers side.
Image 5-1
R5906753 DPXK BLP SERIES 20/11/2017
37
Содержание DP2K-17BLP
Страница 4: ......
Страница 8: ...Table of contents 4 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 30: ...3 Installation process 26 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 40: ...4 Physical installation projector 36 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 120: ...10 Communicator Touch Panel Image 10 7 Connections 116 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 152: ...14 Maintenance 148 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 158: ...15 Convergence Green 1 5 4 6 5 Image 15 8 Green on blue convergence 154 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 162: ...16 Color calibration 158 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 176: ...18 Specifications 172 R5906753 DPXK BLP SERIES 20 11 2017 ...