5. Physical installation top cooler
Image 5-4
2. Slide the front plate with both
fi
xation brackets fully on both side covers.
Turn in the 4 set screws (M3) and tighten them fully until the brackets are pushed strongly against the ribs in the cover.
Note:
There may be paint job markings left on the internal side of the side covers (e.g. in the grooves for the positioning pin).
These markings are no thread nor should they be mistaken for such.
40
R5906753 DPXK BLP SERIES 20/11/2017
Содержание DP2K-17BLP
Страница 4: ......
Страница 8: ...Table of contents 4 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 30: ...3 Installation process 26 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 40: ...4 Physical installation projector 36 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 120: ...10 Communicator Touch Panel Image 10 7 Connections 116 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 152: ...14 Maintenance 148 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 158: ...15 Convergence Green 1 5 4 6 5 Image 15 8 Green on blue convergence 154 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 162: ...16 Color calibration 158 R5906753 DPXK BLP SERIES 20 11 2017 ...
Страница 176: ...18 Specifications 172 R5906753 DPXK BLP SERIES 20 11 2017 ...