3.
Put the front log guard under an
angle between the two front ribs of
the cast iron side panels.
4.
Move the front log guard until it is
horizontal and lower it as far as
possible.
10.6.6
Install the upper baffle
Only do this procdure after finish of the procedure in section
1.
Move the upper baffle under an angle
into the combustion chamber.
2.
Move the left side of the baffle as
high as possible to the far left side of
the combustion chamber.
3.
Move the right side of the baffle up
until it is horizontal.
4.
Lower the baffle into the baffle
holder.
Maintenance
50
Cuatro-7 75-60
Содержание Cuatro-7 75-60
Страница 6: ...1 Declaration of performance Declaration of performance 6 Cuatro 7 75 60...
Страница 56: ...11 2 Connections on Opti Air system Technical data 56 Cuatro 7 75 60...
Страница 59: ...12 Dimensions 12 1 Cuatro 7 75 60 with built in frame Dimensions Cuatro 7 75 60 59...
Страница 60: ...12 2 Cuatro 7 75 60 with built in frame and convection casing Dimensions 60 Cuatro 7 75 60...
Страница 66: ...12 8 Cuatro 7 75 60 with classic frame Dimensions 66 Cuatro 7 75 60...
Страница 67: ...12 9 Cuatro 7 75 60 with classic frame and convection casing Dimensions Cuatro 7 75 60 67...
Страница 75: ...Warranty Terms Cuatro 7 75 60 75...
Страница 76: ...Your Barbas dealer 001 28 06 2022 352574 271 001...